Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Intercity and Regional > Dublin Mayo
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 24-01-2007, 18:59   #1
Oisin88
Member
 
Oisin88's Avatar
 
Join Date: May 2006
Location: Dublin
Posts: 608
Angry 100% of trains on the Dublin-Westport Line ran as planned

What is this supposed to mean?

1) They ran it with trains and not bicycles.
2) None of the trains accidentally went to Galway or something.
or does it mean that IÉ planned to have it arrive late at Tullamore anytime I was on it, only have a trolley service on days when I had a full breakfast before leaving the house, have the heat turned on in summer and no heat in winter (only on trains I was on)

I read it on the poster that has been put in Tullamore station to celebrate 92% of trains on this route arriving (somewhere) on time. I know that this has been discussed at length elsewhere and in the passenger issues section of the home page (http://www.platform11.org/passenger_issues/not_getting_there.php) but it puts my blood pressure up every time I see it. Padding and very creative statistics. I'd like to see what the "margin of error" is.

Last edited by Oisin88 : 24-01-2007 at 19:15.
Oisin88 is offline   Reply With Quote
Unread 24-01-2007, 19:12   #2
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Limerick gets the same 100% all ran

All ran means all trains ran according to the service IE planned so it excludes engineering works also even if the train breaks down it still left the terminus

Its really hard not to get 100% Cork won't for Q4 2006 or Q1 2007

Take a look http://www.railusers.ie/members/ie_mou, the long sought after agreement between IE and the DoT

Last edited by Mark Gleeson : 29-07-2008 at 08:51.
Mark Gleeson is offline   Reply With Quote
Unread 24-01-2007, 19:14   #3
Oisin88
Member
 
Oisin88's Avatar
 
Join Date: May 2006
Location: Dublin
Posts: 608
Default

but "according to the service IE planned" could be anything?
Oisin88 is offline   Reply With Quote
Unread 24-01-2007, 20:31   #4
hhf8
Regular Poster
 
Join Date: Nov 2006
Location: Balbriggan
Posts: 137
Default

not that difficult to get 3 trains to run on time tho really,
__________________
Compute the Commute
hhf8 is offline   Reply With Quote
Unread 25-01-2007, 18:02   #5
Oisin88
Member
 
Oisin88's Avatar
 
Join Date: May 2006
Location: Dublin
Posts: 608
Default

Quote:
Originally Posted by hhf8 View Post
not that difficult to get 3 trains to run on time tho really,
They don't. There is just so much padding that 92% of them get to Heuston or Westport on time.
Oisin88 is offline   Reply With Quote
Unread 26-01-2007, 12:32   #6
eireguy
New to the board
 
Join Date: Jan 2007
Location: Meath
Posts: 3
Default

was there not a Ballina - Casltebar service batted about?
eireguy is offline   Reply With Quote
Unread 26-01-2007, 17:32   #7
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

eireguy -
Quote:
A new local service will begin operation, linking some of the Mayo’s major towns courtesy of modern railcars operating on the Ballina branch line.
The existing operation of a Ballina to Manulla Junction service connecting into Westport to Dublin trains is being extended to provide a local service.

Modern railcars, which are replacing old locomotive-hauled carriages on the line, will continue to connect into Westport-Dublin services, but will also operate return connections to provide a Ballina-Foxford-Castlebar-Westport service three times each way daily. These railcars will be accessible to mobility-impaired customers.
Who knows with the increase in stops maybe Manulla will become a public platform rather than a transfer point? Normally I wouldn't say it was worth it except the trains will stop there regardless so why not pick up some trade?
dowlingm is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 01:21.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.