Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > General Information & Discussion > Events, Happenings and Media
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Closed Thread
Thread Tools Search this Thread Display Modes
Unread 06-07-2007, 21:16   #1
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default [Article] Integrated ticketing for Metro West by 2014

My, my, my. We are ambitious, aren't we?

http://home.eircom.net/content/irela...=Top%20Stories
Quote:
Integrated ticketing for Metro West by 2014
From ireland.com
Friday, 6th July, 2007

Commuters on the planned orbital Metro West line from Tallaght to south of Dublin airport should be able to use integrated tickets by the time the new line is open in 2014, according to Minister for Transport Noel Dempsey.

Under plans for the 25 km line, which will be entirely overground and will pass through Clondalkin rather than Lucan, passengers will also be able to travel from Tallaght to Dublin airport in under an hour.

In order to do this, Metro West trains will either switch onto the planned Metro North line at a point shortly before the airport, or passengers will transfer to a Metro North train which will take them to the airport itself.

The new line will avoid the city centre entirely.

Amid continuing criticism of the length of time it has taken to introduce a system of integrated ticketing here, a spokeswoman for Mr Dempsey last night said he was confident this would be up and running when the new line opened in 2014.

Such a system would allow commuters to use the same ticket across a range of public transport options, she added.

The emerging preferred route selected by the Railway Procurement Agency (RPA) will operate from Tallaght through Clon- dalkin, Liffey Valley, Blanchardstown, the National Aquatic Centre, Huntstown and Harristown. Work is expected to start in 2009. It will have up to 20 stops and is expected to carry about 20 million passengers a year.

In choosing the route, which may be modified further, the RPA rejected a proposal to run the line through Lucan. This is thought to be partly due to the fact that Lucan is due to have access to a Luas link in the future.

Similar in style to the Luas, but with significantly greater capacity, Metro West will run on the surface with trains crossing major traffic junctions via specially built bridges.

The new line will begin at Tallaght East, where the stop will be some 400m from the Luas Red line. However, the RPA will consider moving the Luas Red line closer to the proposed stop to fully integrate the services.

A public consultation process is due to commence shortly to determine the number of stops, locations and "park and ride" facilities on the line.
Colm Moore is offline  
Closed Thread


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 21:23.


Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.