Unread 23-11-2006, 07:53   #1
Navan Junction
Really Regular Poster
 
Join Date: Feb 2006
Location: Navan
Posts: 305
Default Metro West Route

Planned metro runs on flimsy supports

Irish Times, 23rd Nov 2006

Failure to spell out the reasoning for Metro West undermines credibility of plan, writes Frank McDonald, Environment Editor.

On the long shopping list of projects in the Government's €34.4 billion Transport 21 investment programme, the biggest question mark hangs over Metro West, which would link Tallaght with Lucan, Clondalkin, Blanchardstown and Ballymun.

At present, there isn't even a bus service between these centres.

Now it is proposed to provide them with what the Railway Procurement Agency (RPA) calls a "modern, attractive and highly accessible urban railway", which would have a capacity of 30,000 passengers per hour.

According to Minister for Transport Martin Cullen, "preliminary forecasts suggest that Metro West . . . will carry up to 20 million passengers a year". Yet we have not been told what the basis for these "forecasts" is or how much it will cost to realise them.

As in the case of Metro North, which would link Swords and Dublin airport with St Stephen's Green, no business case or cost-benefit analysis has been published for Metro West. Indeed, like every other element of Transport 21, this project is shrouded in secrecy.

Even calling it a "metro" is a misnomer. As Mr Cullen himself noted yesterday, it would run entirely on the surface, even crossing road junctions in a similar manner to the Luas, although bridges would obviously be required at major roads, railways and other crossings.

In effect, Metro West would be a souped-up version of the Luas. Even the computer-generated image issued by the RPA shows a fatter-looking tram at a street stop. By contrast, much of Metro North would run underground - like most "metros" worthy of the name.

Yet Metro West is now going to public consultation, and the RPA intends to make a decision on which route it would follow "early in the new year". Detailed design work would follow, with a view to submitting an application for a railway order "within a year".

Curiously, the half-orbital rail line is not due for completion until 2014, which would make it one of the last projects to be delivered under the Transport 21 timetable. Why it could take so long is a mystery, but the delay is presumably related to its procurement under a public-private partnership.

As for why it's needed, the Minister said west Dublin "has seen some of the most intense growth in housing and other development in the last decades [ and] this has resulted in large demand for travel to and from and within the area".

He might have mentioned that the proliferation of shopping centres, business parks and industrial estates in the M50 corridor is largely responsible for chronic congestion on the motorway that was originally meant to serve as a by-pass of Dublin.

But while the pace of development in west Dublin and beyond has been intense, it could hardly be called intensive. It has all the characteristics of a North American "edge city", which means that there would be long distances to get to "metro" stops.

If the shortest of the two route options is chosen, the proposed rail line could offer shopping centre excursions between The Square in Tallaght, Clondalkin town centre, Liffey Valley shopping centre, Blanchardstown centre and Ballymun town centre.

The M50 has been dubbed by economist Colm McCarthy as "Dublin's new main street", and Metro West would reinforce the edge city axis. It would also connect with Metro North, the Kildare and Maynooth rail lines, the Tallaght Luas line and the proposed Lucan Luas line.

With Metro North due to be completed in 2012 at a likely cost of €3.5-€4 billion, who can say that a government more strapped for cash than the present one would not pull the plug on Metro West?
Navan Junction is offline  
Unread 23-11-2006, 08:05   #2
Navan Junction
Really Regular Poster
 
Join Date: Feb 2006
Location: Navan
Posts: 305
Default Cullen announces optional routes for metro line

John Downes, Irish Times, 23rd Nov 2006

Details of two optional routes for Dublin's new Metro West line were unveiled by Minister for Transport Martin Cullen yesterday.

It is expected that the new orbital line, stretching from Tallaght to the Metro North line south of Dublin airport, but avoiding the city centre, will be overground. Construction is due to start in 2009, with a series of public consultation meetings commencing next January. It is expected to be completed by 2014.

It is hoped that a preferred route will be chosen by early next year, followed by further planning and selection of a public-private partnership (PPP) partner.

The service will accommodate an estimated 20 million passengers per year, while the length of the track could stretch to 28 kms, according to the Railway Procurement Agency (RPA).

As it is a PPP project, Mr Cullen yesterday declined to disclose how much it is expected to cost. But while land acquisition costs are a significant factor, he said it was necessary to take into account the overall project costs.

He pointed to the National Roads Authority's recent claim that the cost of building motorways here is approximately half the cost of building motorways in the UK.

"I think that (the 2014 timeline for completion) is quite satisfactory. If it can be done in stages or opened in stages, that will be done," Mr Cullen said. "The problem we have with a lot of the public transport systems that exist is that they all come into the city centre."

Frank Allen, chief executive of the RPA, said it did not have a preferred route. He also expected there would be little difference in the cost of acquiring land on either of the proposed routes.

Under the plans, any final route will link up with the recently announced Metro North line, either by sharing its track to the airport or by passengers transferring to the new northern line.

The first optional route would start on the Belgard Road in Tallaght, and would serve Tallaght IT, The Square shopping centre,Tallaght village, Clondalkin town centre, Liffey Valley and Blanchardstown town centre.

The second option commences at the Luas Red Line's Tallaght stop, continuing to Cookstown Road. It proceeds to Kingswood, crossing the Naas road to Grange castle, Clondalkin, the Blanchardstown town centre and Blanchardstown IT.

However, the final route may be a variation or combination of the two route options, other options or sub-options.
Navan Junction is offline  
Closed Thread


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 05:28.


Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.