![]() |
![]() |
#13 |
Really Regular Poster
Join Date: Jan 2006
Posts: 767
|
![]() As the new L Jcn platform simply removes a constraint on current operations it could usefully be be brought into operation when conflicts or delays might arise (as with the 1700 ex Heuston). Careful observation of how long it takes passengers to make it over the bridge to the Limerick connection would give very useful information for the detailed timings in the new December schedule.
|
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|