![]() |
|
![]() |
#1 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Quite a few Maynooth trains heavily delayed before reaching Glasnevin this morning, so can't be blamed
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#2 |
Member
Join Date: Oct 2006
Posts: 395
|
![]() Some delays this evening with 15 and 25 min delays.
One service, 1758 ex GCD arrived 10 mins late in Hazlehatch at 1856 according to realtime but the connecting service to Portlaoise left on time at 1851. Therefore connecting passengers had a long 35 wait for the 1905 from Heuston. The next train, 1816 GCD-Newbridge was 25mins late. Probably a knock on effect of the DART delays. Presumable IE don't want to disrupt Heuston services if a GCD is late. If the 1825 had been held for 10mins, it might have delayed the 1900 to Cork. Looks like it could be complicated for those relying on connections. |
![]() |
![]() |
![]() |
#3 |
Really Regular Poster
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
|
![]() Although there's a big car park there, I presume there would be some CPOs of houses required if anyone wanted to put in an additional terminating platform at Hazelhatch?
|
![]() |
![]() |
![]() |
#4 | |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
![]() Quote:
I believe IE have a little land at Dublin end of car pack, there is 2-3 houses there no occupied |
|
![]() |
![]() |
![]() |
#5 |
Really Regular Poster
Join Date: Oct 2006
Location: Celbridge
Posts: 259
|
![]() I think that they may have been sold a while ago, but not developed yet.
|
![]() |
![]() |
![]() |
#6 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() The current arrangements in Hazelhatch would support a train every 15 minutes without issue
You also have a turn back at Adamstown which again could support a train every 15 minutes without issue. And of course the platform in Newbridge There is space for headhunt south of Hazelhatch is needed but no extra platform needed Plenty of places to hide trains Car park isn't exactly full at any station enroute
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#7 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
![]() There was a points failure this afternoon meaning maynooth line services had to use Newcomen junction and the midland line.
If this had've happened this evening....... |
![]() |
![]() |
![]() |
#8 |
Member
Join Date: Oct 2006
Posts: 395
|
![]() The 1728 GDC-Newbridge, a 4-car ICR, was over 90% loaded today. Not bad after less than 2 weeks.
Hazelhatch service lag a little behind in loading. The 1805 Heston-Portlaoise has been upgraded to a 7-car; it is a amalgamation of the 1755 and 1810 trains. Presumably they needed the 1755 slot for the 1728 from GCD. |
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|