![]() Even allowing a generous spare allocation of 18 coaches and allowing for the 10 Alstom units you can have an entire 6 coach operation, but since you can't currently couple a LHB 2 car to a Japanese set you can't get the maximum capacity option.
Best case assuming everything couples to everything 4 8 coach 15 6 coach 1 4 coach (this is the morning Dun Laoghaire extra with a DART 5 minutes either side) If you cut the journey time by 5 minutes end to end you need 1 fewer set and works for the current fleet with no engineering required 7 8 coach 11 6 coach 1 4 coach (this is the morning Dun Laoghaire extra with a DART 5 minutes either side) What you will actually get is 6 8 coach 11 6 coach (only LHB units can run in 6 car formation) 3 4 coach (this is the morning Dun Laoghaire extra with a DART 5 minutes either side)
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|