![]() |
![]() |
#12 | |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
![]() Quote:
As for expanding Kilkenny they would have to remove the buffers again and move the walk to P2 further down which is possible will cost a bit (foot bridge closed). Not possible to extend P1 out because of a building, P2 is possible but it would be a little tight and require signal removed. When I get a look at what exactly they are doing in KK will post, you never know they may even have that in mind. IE cannot lose the same business they did last September from the 18.05 on Sundays, Cork will need to return to Mark IV to free up the 6 coach unit or drop it back to 5 instead. Last edited by Jamie2k9 : 19-08-2015 at 21:47. |
|
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|