Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > General Information & Discussion > Up To Date Travel Information
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 03-06-2012, 10:09   #1
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default [03/06/2012]-Dart Services Resume Between Bray-Dun Laoghaire

Due to flooding on the line a Commuter train shuttle was operateing between Dun Laoghaire-Bary as a replacment for the Dart.
Jamie2k9 is offline   Reply With Quote
Unread 03-06-2012, 11:34   #2
karlr42
Member
 
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
Default

Unusual forethought there, I can't remember that happening in previous flooding.

I presume the reason DARTs can't go through flooding is because the circuit from the OHLE through the train earths through the running rails, so if operating under water the water would be electrified?
karlr42 is offline   Reply With Quote
Unread 03-06-2012, 11:49   #3
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

Quote:
Originally Posted by karlr42 View Post
Unusual forethought there, I can't remember that happening in previous flooding.

I presume the reason DARTs can't go through flooding is because the circuit from the OHLE through the train earths through the running rails, so if operating under water the water would be electrified?
More of an issue with keeping the traction motors in the bogies out of the water. The rails are not electrified but are earthed.
Kilocharlie is offline   Reply With Quote
Unread 03-06-2012, 11:56   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Ground clearence on the Dart fleet is very low so does present a problem in flooding conditions

Once the water is below rail height it should be okay

Secondary issue is the ATP system might not work underwater, the ATP cannot be disabled on a Dart but it can on the diesel fleet
Mark Gleeson is offline   Reply With Quote
Unread 03-06-2012, 13:15   #5
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by Mark Gleeson View Post
Ground clearence on the Dart fleet is very low so does present a problem in flooding conditions

Once the water is below rail height it should be okay

Secondary issue is the ATP system might not work underwater, the ATP cannot be disabled on a Dart but it can on the diesel fleet
Unless things have changed, the DART ATP can, in fact, be partially disabled by the driver, but this only allows the train to travel at 30 kph. Were this not the case a DART suffering an ATP failure would only be able to proceed at walking pace and would effectively shut down the service. Normal procedure would be to de-train the passengers and continue empty to clear the line.

Interesting that a diesel shuttle was announced - did this actually happen ?

Given the deficiencies of the layout at Dun Laoghaire, the shuttle trains would either have to have operated on one line between Dun Laoghaire and Dalkey or else shunt via the connections at the north end of Dun Laoghaire station.
Inniskeen is offline   Reply With Quote
Unread 03-06-2012, 13:19   #6
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Once disabled the ATP locks you to I think 20kph, can only be reset at the depot and has other implications (it triggers an alarm at the control centre) so not much use once you clear the effected region. I presume the DART safety case requires the ATP to be ON at all times save for an emergency move to the next station.

Routing would be south bound through station then reverse thus always uses the correct platforms
Mark Gleeson is offline   Reply With Quote
Unread 03-06-2012, 16:08   #7
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by Mark Gleeson View Post
Once disabled the ATP locks you to I think 20kph, can only be reset at the depot and has other implications (it triggers an alarm at the control centre) so not much use once you clear the effected region. I presume the DART safety case requires the ATP to be ON at all times save for an emergency move to the next station.

Routing would be south bound through station then reverse thus always uses the correct platforms
Fairly sure its 30kph. Presumeably the alarm to the control centre would reset if the ATP were re-enabled although regulations would probably require a seal to be re-applied

Not sure what you mean by the second point. You can only cross from one line to the other at the north end of Dun Laoghaire station. Any northbound shuttle service (from the Bray direction) using the northbound line and terminating at Dun Laoghaire must therefore shunt via the north end of Dun Laoghaire station in order to return on the southbound line.

The other option for a shuttle service between Dun Laoghaire and Bray would be to operate in both directions on the same line between Dun Laoghaire and Dalkey - an arrangement which might suit a situation where one line was more affected by flooding than the other.

Am I missing something ?

Last edited by Inniskeen : 03-06-2012 at 16:40.
Inniskeen is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 08:31.


Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.