![]() |
![]() |
#2 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() There was at the time a plan to acquire a 125mph capable diesel locomotive which would take over Dublin Cork and possibly Dublin Belfast.
The absence of money has put an infinite hold on the plans. Double heading has been ruled out on fuel cost grounds there is a minor technical issue with the push pull controls as well as the door controls get messed up Reliability Dublin Cork is pretty good by international standards, certainly better now than the Mk3 era. Its far better than Dublin Belfast.
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|