Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > General Irish Rail Discussion
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
Old 16-07-2011, 20:14   #1
KSW
Really Regular Poster
 
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
Default

first class on the 22k are a joke. what i would call first call would be the enterprise service even its standard class is comfortable,has that dark lightening effect rather than the bright display on the 22k trains.
IE should upgrade their 22k 1st sets to a more higher standard.
KSW is offline   Reply With Quote
Old 16-07-2011, 23:11   #2
sean
Member
 
sean's Avatar
 
Join Date: Dec 2005
Location: Dublin
Posts: 707
Default

Quote:
Originally Posted by KSW View Post
first class on the 22k are a joke. what i would call first call would be the enterprise service even its standard class is comfortable,has that dark lightening effect rather than the bright display on the 22k trains.
IE should upgrade their 22k 1st sets to a more higher standard.
Either that or abandon the 1st class label and just make the seats available to everyone under all circumstances. (i.e. not just the trains that have the sets but are not timetabled for first class).

The few times I've been on Sligo trains (no first class timetabled) that had them, I would only ever take the "1st class" seats for one reason - noone else had bothered with them.

FWIW I think a proper 1st class carriage would have 2+1 seating with super-wide individual seats, this at an absolute minimum. At seat catering and free wifi would not go astray either, ideally.

Last edited by sean : 16-07-2011 at 23:14.
sean is offline   Reply With Quote
Old 24-09-2011, 21:15   #3
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

How often do IE carry out maintence/service the 2200 trains. Would of thaught at least once a week, does anybody know.
Jamie2k9 is offline   Reply With Quote
Old 24-09-2011, 21:51   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Basic exam should be every 48 hours, but thats basic check of all main systems and top up for fluids

It can be done in siding if needs be, but if its not done, train is not allowed to move.
Mark Gleeson is offline   Reply With Quote
Old 24-09-2011, 21:59   #5
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

There is a cycle of maintenance. Certain things will be checked after X time and/or Y distance. Different things will be checked after every 3X or 3Y, 10X or 10Y and so on for higher order issues. Then there will be more serious depot level inspections in a monthly / quarterly / annual / 5-annual cycle. Incidents or particularly harsh operating conditions may see those time periods speeded up, e.g. the cold weather the last two years say toilet systems freezing. It would have been prudent to check those systems more regularly during and after that weather.0

I imagine drivers are meant to check certain basic things everytime the loco / train is started.

I imagine sets will get a walk through once a day, with fueling and possibly lubricant added, but they can generally survive a few days before gettting back to base before issues start happening.
__________________
Colm Moore is offline   Reply With Quote
Old 24-09-2011, 22:18   #6
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Sunday 11 Sep - 18.05 Waterford - Heuston
Monday 12 Sep - 18.35 Heuston - Waterford
Wednesday 14 Sep - 6.00 Waterford - Heuston
Sunday 18 Sep - 18.05 Waterford - Heuston
Friday 23 Sep - 16.35 Heuston - Waterford
All were same done by the same train - 6 car first class set.

Engine in carriage F not working on above services, no air con/heat, power sockets, Wheelchair toilet out of order (door doesn't close all the way). People asked for air con to be put on but were told the train had slight mechanical problems. That was on Sun 11.

Would of though they would have had it fixed by now.

On Friday the train tried to move in Nass, Athy and Muine Beag and it couldn't move for a while, were told on arrival in Waterford that the delay was due to mechanical problems.

So that around 3 weeks and none of the problems have being addressed, should something of being done by now or not.

Last edited by Jamie2k9 : 24-09-2011 at 22:37.
Jamie2k9 is offline   Reply With Quote
Old 25-09-2011, 00:37   #7
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Do you know what set it was?
__________________
Colm Moore is offline   Reply With Quote
Old 25-09-2011, 06:08   #8
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

22037 (the one that derailed in Laois Train Depot) is out on test, no doubt as soon as it makes an appearance in service some items on the other 1st sets might be magically put on the to-fix list
dowlingm is offline   Reply With Quote
Old 25-09-2011, 14:14   #9
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Set 37 is still on test, it needs to make a few round trips to Cork as part of the shakedown trials as a result of being in several pieces due to the accident and also to bed in the various modifications made.
Mark Gleeson is offline   Reply With Quote
Old 26-09-2011, 15:50   #10
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

It was number 35 but no need to worry about it now. Operated 19.05 Heuston - Tralee and failed at Cherryville last night. They got it pulled back to Kildare to clear the line and it was still there at Kildare at 20.10.
Jamie2k9 is offline   Reply With Quote
Old 26-09-2011, 20:39   #11
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

I very much doubt that as it managed to get to Mallow and beyond at that point 30 minutes late, so either there is something else going on or Irish Rail executed a tow and recover and passenger swap in the time it normally takes them to realise they need to do that

The 19:25 to Limerick ran on-time and did not overtake the 19:05 to Tralee
Mark Gleeson is offline   Reply With Quote
Old 26-09-2011, 22:14   #12
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

We were in Kildare just after 20.00. The tralee train was on the down platform with the driver in the cab facing for Dublin. Passengers were on the train at that point. The Limerick train passed use about 5 mins after we left. Nothing on IR twitter page about it.

There was two people walking around looking at the engines to.

Our driver said sorry about the delay, was due to Tralee train failing.

Last edited by Jamie2k9 : 26-09-2011 at 22:18.
Jamie2k9 is offline   Reply With Quote
Old 10-10-2011, 22:19   #13
2200DMU
Regular Poster
 
Join Date: Oct 2011
Posts: 66
Default

If all enignes on a 6 car 2200 shut down while passengers onboard do IE have a back up system for lights etc. Yesterday on the 18.05 Waterford - Heuston train completely shut down 3 times. 2 in Kilkenny and one in the middle of no where and its was pitch dark. This is the second week in a row it has happoned.
2200DMU is offline   Reply With Quote
Old 10-11-2011, 13:49   #14
joey
Regular Poster
 
Join Date: Nov 2010
Location: Coach A
Posts: 188
Default New Rolling Stock

Where is the new rolling stock that was due this year?
joey is offline   Reply With Quote
Old 22-11-2011, 20:43   #15
joey
Regular Poster
 
Join Date: Nov 2010
Location: Coach A
Posts: 188
Default

http://www.flickr.com/photos/translinkni/

http://www.translink.co.uk/NI-Railwa...Trains-Images/

Quality, time to take the blinkers off IR.
joey is offline   Reply With Quote
Old 23-11-2011, 01:14   #16
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Quote:
Originally Posted by joey View Post
Interesting the way they are squashing seats in around the toilet.
__________________
Colm Moore is offline   Reply With Quote
Old 09-01-2012, 20:24   #17
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Is 22033 in service and has the carrage that went of fire. Have yet to see it operateing as a 5 peice.
Jamie2k9 is offline   Reply With Quote
Old 12-01-2012, 22:36   #18
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

22033 should be back very soon. Yesterday it was taken from Portlaois - Inchicore for works.

http://thewandererphotos.smugmug.com...4984&k=FG8rrPv

Also if you click on Mark4 picture its says another 2200 was damaged recently.
Jamie2k9 is offline   Reply With Quote
Old 13-01-2012, 16:49   #19
Destructix
Really Regular Poster
 
Join Date: Aug 2011
Location: North Tipperary
Posts: 258
Default

Checked out that link and :O is this true? Please tell me it is

From http://thewandererphotos.smugmug.com...0413&k=GZmp32g

Quote:
2724 + 2715 at Ennis after arriving with the 1235 from Limerick. 2011 wasn't a good year for the 2700 Class with plans to store them in 2012, being replaced with 2800 Class displaced from Drogheda by the new 22000 Class Intercity DMU's. Sat 31.12.11
About time they get rid of them 2700

Though I still don't get why Limerick Junction-Limerick isn't intercity especially at peak times.
Destructix is offline   Reply With Quote
Old 13-01-2012, 16:55   #20
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Quote:
Originally Posted by Destructix View Post
Though I still don't get why Limerick Junction-Limerick isn't intercity especially at peak times.
There are direct Limerick-Dublin services that bypass LJ at peak times (15:25 16:25 17:25 ex-Dublin). With a connecting service, having the extra doors of a commuter-type train is useful.*



* Yes, they could do with doing something to keep the heat in.
__________________
Colm Moore is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 14:06.


Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.