![]() |
|
![]() |
#1 | |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Quote:
What RTE missed was about 30 seconds later, the pa telling us of a delay due to a signaling fault, that would have priceless on air
__________________
Unhappy with new timetable - let us know |
|
![]() |
![]() |
![]() |
#2 | |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() Quote:
![]() |
|
![]() |
![]() |
![]() |
#3 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() IE got the ok on Monday afternoon, they was no uncertainty
All the those staff where present on the platform at 11:05 yesterday morning
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#4 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
![]() 6 car set parked on P1 this evening, which would suggest they're still running 6 cars on the test service.
|
![]() |
![]() |
![]() |
#5 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() Yeah Mark but even Monday a.m. might have been too late to get at least the politicos to come. Don't know what the IEers excuse could be.
|
![]() |
![]() |
![]() |
#6 |
Member
Join Date: Dec 2005
Location: Dublin
Posts: 707
|
![]() I took my first journey on the new railcars yesterday (the 20th). I took a short round trip from Longford to Boyle, in Co. Roscommon.
Very impressive I must say - they really are Intercity railcars. On a scale of 1/10, with the 29ks being 0, a broken down boxcar being 1 and the German ICE being 10, I'd give these coaches a 9. Noise and ride quality were both generally comparable to an Mk2d set. Major pluses there. Decor, much as I remember it, also very nice. No trouble getting my favourite seats either as there was a 2 car loading spread out over a 6 car set ![]() ![]() To say that these railcars beat the nuts off a 29k under every imaginable metric would be the understatement of the decade. TBH I didn't even notice all the colours that had been changed, with the exception of the doors, and the door control buttons which have been reset to match those of the rest of the fleet/rest of Europe. My only complaints would be these: 1: They make a powerful racket when accelerating. 2: The suspension is a bit of a mixed bag. This may well belong in the members section, but here goes. When I went to the show in Sligo back whenever it was, I saw that the suspension was a combination of old school springs and some posh hydraulics or air suspension setup on top of that. Experience has shown me that when it comes to suspensions on trains destined for Sligo and perhaps anywhere in Ireland, that the simpler and more old school the suspension, the better. The 2800s and Mk2ds (both good) vs the 29ks (crap) prove that you can get a better ride by not complicating things. The conclusions I took from that were that these trains ride would be generally solid as the whole bodyshell rested on springs, but that the hydraulic thingy on top of it would have to be watched carefully. My journey today more or less confirmed that, as the ride was generally good but there were times when the coaches swayed for no good reason except perhaps the curves. Now, it's nowhere near as bad as a 29k, thank f***, but it still could have been done without. Methinks they can make the ride better by tightening the suspension and further limiting the role of those hydraulic thingies. But I'm not bashing the 22ks for this because even the Mk2ds I love so much would have had some issues with curves as well - try walking through a carraige at full speed anywhere in Co. Meath for example. Last edited by sean : 21-12-2007 at 00:33. Reason: spelling |
![]() |
![]() |
![]() |
#7 | |
Really Regular Poster
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
|
![]() Quote:
I like the 29000 trains they are much better than those 2800 crap yolks I'II have the whole of Dublin Commuters eating me for saying that but I do. I'm not surprised about the powerful racket when accelerating but when you say Powerful that doesnt sound good. I am delighted that the 22000 trains have that InterCity feeling. |
|
![]() |
![]() |
![]() |
#8 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() I said it should run the 11:05, not that it would
It ran the 8:55 Sligo Dublin this morning, if it had run the 6:55 it would have been on the 11:05 Should as a result work the 17:05 back this evening
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#9 |
Really Regular Poster
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
|
![]() I seen the 22006/2 when waiting for the Enniscorthy train to Gorey and I have to say seeing it close up it really does look something else. The inside looks really impressive, The drivers cab looks the best.
Your fine Mark, I'II go again in January when they all enter service. All I can say is the lucky driver . . . . . . . . |
![]() |
![]() |
![]() |
#10 | |
Membership Officer
Join Date: Dec 2005
Location: Maynooth
Posts: 1,116
|
![]() Quote:
Sadly with Irish Rail, these mundane things like punctuality and customer experience are often missing. |
|
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|