![]() |
[15/10/2013] All AM services into Connolly delayed
LED displays only showing 1 line of information....Due to operational reasons services operating up to 20 minutes late.
IE realtime showing 10 min delays to all inbound trains, but only 5 minute to northbound. Any ideas on exact reason? |
Everything is showing on time currently
|
Maybe it was from the evening before, or early morning. I was about 8 mins late into Connolly around 8.15am....
|
Cork and Limerick services were running 20-30 mins late this morning due to 'speed restrictions around Templemore'. The 0710 from Waterford made additional stops at Kildare and Sallins to relieve the late running 0640 from Limerick.
|
Quote:
|
Quote:
|
Does anyone have any info as to what the problem was south of Templemore. The restriction was lifted very quick pretty much after the morning services. Know IE it will be the "wheel slip" excuse.
|
Quote:
|
Quote:
Since the start of October: 02/10 - 8.06am late 08/10 - 8.06am late 09/10 - 7.52am late 11/10 - 7.52am late 15/10 - 8.06am late 16/10 - 7.52am late These delays are ongoing not just since the start of October. |
Quote:
|
Quote:
|
Quote:
|
And where ? Are they late at Heuston, Hazelhatch or both ?
|
07:20 ex Portlaoise
2/10 +8 (Delayed Cherryville) 8/10 +2 (no delay) 15/10 (no data wrong train code used) 07:35 ex Hewbridge 9/10 +5 (delayed departing Newbridge, train was in platform 15 minutes before scheduled time 11/10 +2 (no delay) 15/10 +0 (no delay) 16/10 +8 (delayed departing Newbridge, train was in platform 11 minutes before scheduled time 5 of the 8 seem to be within agreed performance targets used worldwide, 6th we know nothing about and the other two are within Irish Rail contract conditions. All delays appear to be delays due other trains, the schedule of the trains in question is practical. Question is what is acceptable? within 5 minutes is the world standard |
All times are GMT. The time now is 23:35. |
Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.