Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Commuter Services > Drogheda-Balbriggan-Skerries-Donabate Line
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
Unread 12-10-2010, 20:48   #1
Rashers
Really Regular Poster
 
Join Date: Dec 2005
Posts: 431
Default 07.10 Dundalk to Bray to operate as 6 carriages from now on

Following yesterday's overcrowding and delays at Donabate, the same was repeated again this morning. The delays this morning were longer.
Yet again not a single apology from the driver, or any explanation of either the overcrowding or the time spent sitting outside Connolly.
I checked with Connolly information desk, and they advised they received numerous complaints about the overcrowding, and leaving passengers behind at Donabate. And yes, passengers were equally complaining about a complete breakdown in communication.
So this afternoon, I checked with the Northern Suburban office on this.
As we know, since the new Dunboyne line opened, Irish Rail have had to reduce capacity on all other commuter lines to supply the new line with trains.
Originally, the 07.12 Drogheda-Bray service was reduced to 6 carriages, but this led to severe overcrowding, so much so, that the commuter service 20 minutes later had to make additional stops to pick up passengers left behind (this is turn led to delays to this service, as was mentioned in previous posts).
So anyway, effective yesterday, the 'carriage reduction programme' has switched to the 07.10 Dundalk to Bray service. This will continue until further notice, or till enough people complain. I suggested that it might be an idea to put up a notice (especially in Donabate) to let passengers know, and therefore they could try get an earlier/later service. We'll see what happens....
__________________

Last edited by Rashers : 12-10-2010 at 20:53.
Rashers is offline   Reply With Quote
Unread 13-10-2010, 16:14   #2
OisinDunne
New to the board
 
Join Date: Aug 2009
Location: Bettystown
Posts: 12
Default

Do we know how many trains are affected by this program?


The 16:43 out of Pearse is also only 6 long.
Is it IR's plan to attack the rush hour?

Last edited by OisinDunne : 13-10-2010 at 16:29.
OisinDunne is offline   Reply With Quote
Unread 13-10-2010, 17:19   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

2 coaches were stolen (sorry borrowed) to provide the trains to run the Dunboyne line service. No way around it
Mark Gleeson is offline   Reply With Quote
Unread 13-10-2010, 19:27   #4
Rashers
Really Regular Poster
 
Join Date: Dec 2005
Posts: 431
Default

Quote:
Originally Posted by Mark Gleeson View Post
2 coaches were stolen (sorry borrowed) to provide the trains to run the Dunboyne line service. No way around it
Why open the service with borrowed trains? They already admitted they were operating to full capacity on the Northern Suburban line before this...Crazy stuff, with so many Mark 3 carriages lying idle around the country Surely they could have used one of the Mark 3 sets to operate one of the Kildare line services, and send that commuter train to Dunboyne? Or am I missing something...
__________________
Rashers is offline   Reply With Quote
Unread 13-10-2010, 21:15   #5
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Mark are all M3 services running as 4 car? I'm hearing on boards that loads are light (albeit that Hansfield and Broombridge are yet to be added)
dowlingm is offline   Reply With Quote
Unread 13-10-2010, 23:14   #6
sublimity
Really Regular Poster
 
Join Date: Jan 2008
Location: Dublin
Posts: 309
Default

Quote:
Originally Posted by Rashers View Post
Why open the service with borrowed trains? They already admitted they were operating to full capacity on the Northern Suburban line before this...Crazy stuff, with so many Mark 3 carriages lying idle around the country Surely they could have used one of the Mark 3 sets to operate one of the Kildare line services, and send that commuter train to Dunboyne? Or am I missing something...
IE are stubborn sh**s, thats why we aren't seeing the return of mk3s.
sublimity is offline   Reply With Quote
Unread 18-10-2010, 17:42   #7
Rashers
Really Regular Poster
 
Join Date: Dec 2005
Posts: 431
Default

Driver apologised today for the severe overcrowding - first time so far they made an announcement since the problems started last week. Still, passenger left behind at Donabate.....but I assume there are notices up at Donabate station...can someone confirm?
__________________
Rashers is offline   Reply With Quote
Unread 05-12-2010, 15:07   #8
motorhead
New to the board
 
Join Date: Jul 2009
Location: the moshpit
Posts: 19
Default

if they didnt stop at malahide portmarnock howth juc there would b enuf room cant understand this as all these are served by dart
motorhead is offline   Reply With Quote
Unread 05-12-2010, 22:04   #9
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Quote:
Originally Posted by motorhead View Post
if they didnt stop at malahide portmarnock howth juc there would b enuf room cant understand this as all these are served by dart
Quite a few school children do Donabate-Malahide as there is no secondary school on Donabate.

Aslo, while Malahide, Portmarknock & Clongriffen have the DART, it isn't quite enough for their needs.
__________________
Colm Moore is offline   Reply With Quote
Unread 29-01-2011, 17:38   #10
motorhead
New to the board
 
Join Date: Jul 2009
Location: the moshpit
Posts: 19
Angry

yeah but theres 3 darts to 1 commuter train
motorhead is offline   Reply With Quote
Unread 29-01-2011, 18:01   #11
motorhead
New to the board
 
Join Date: Jul 2009
Location: the moshpit
Posts: 19
Angry

anyway the service "provided" by irish rail is third world its never on time i have used trains all over europe lots of seats,modern carriages,bang on time. where as the next thing ie will roll out is something similar to stephensons rocket (it would probably go faster) this is just my own belief but ie couldnt give a flying fiddlers f**k bout the ordinary joe they raise tkt prices for a service well below par think about it when the train pulls in to rush/lusk every morningn at 0658 its 4 carriages long hell its a peek hour train just enough standing room by the time it hits pearse its wall to wall the doors open and its like a human tsunami getting off its a health and safety matter big time sometime someday there will be amajor accident and then like all the other incidents that have happened in our glorious and f**ed country it will be too late suddenly ie will have commitees for this and that and try slip the leash
motorhead is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 13:50.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.