![]() |
|
![]() |
#1 |
Member
Join Date: Mar 2008
Posts: 30
|
![]() Spotted this morning at Greystones, 2 posters proudly proclaiming 'Automatic ticket checking.... in operation at this station shortly'. I don't see how they are planning to fit them in due to the layout of the station currently they can fit in is 2 gates, maybe 3 at most. Unless they are going to rearrange the place by moving the ticket office etc. Perhaps whilst they are doing it they can get the platform displays to work maybe
![]() |
![]() |
![]() |
![]() |
#2 |
IT Officer
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
|
![]() On the platform displays, that's a signalling thing; everything south of Bray (and west of Drumcondra) is on a separate signalling system so don't hold your breath
![]() |
![]() |
![]() |
![]() |
#3 |
Member
Join Date: Mar 2008
Posts: 30
|
![]() If I was to my hold my breath and wait for the displays to work, I probably would die and be long dead before they show anything of interest besides telling me I am at Greystones station! I am not looking forward to the queues in the evening trying to get out!
P.S Why were those new card readers installed on the current turnstiles if they plan was rip they out and install the new gates? Last edited by fergn : 18-09-2009 at 13:24. |
![]() |
![]() |
![]() |
#4 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Smartcard trial starts shortly, well it should have already started, every station must be equiped
The recovered equipment will be installed elsewhere on the network presumably, at the moment only the bare minmum of equipment has been installed, most station only have one reader equiped gate
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#5 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
![]() i've given up on the ones west of drumcondra getting to work any time soon
2011 or 2012 to get displays that went up ten or years before ![]() ![]() I wouldnt hold my breath on greystones either |
![]() |
![]() |
![]() |
#6 |
Regular Poster
Join Date: Dec 2005
Location: Co. Wicklow
Posts: 124
|
![]() Workers have removed the ticket gates today in Greystones Station. Temporary ticket office located just outside the station next to the night exit gate.
What I find peculiar is why the old ticket machines (before being removed today) had just very recently been retrofitted with smartcard readers placed on top of the machine itself. Is it the intention simply to remove these retrofitted machines to install wiring for the new smartcard reader element? It would seem such a waste if they were installing the gates found at Blackrock, Pearse, Tara etc seeing as they just retrofitted the old gates to do the same job. The old machines in the station were unreliable are were often out of service. It would seem rather inefficient to have stuck on those readers on the original gates a mere few weeks ago, and then to have newer machines replace them to do the same job, albeit more stylishly ![]() Anyone know anything about what the work involves? |
![]() |
![]() |
![]() |
#7 |
Really Regular Poster
Join Date: Jun 2008
Posts: 242
|
![]() Something similar appears to be going on in Grand Canal Dock.
Don't get off here myself |
![]() |
![]() |
![]() |
#8 | |
Regular Poster
Join Date: Mar 2006
Posts: 180
|
![]() Quote:
the existing turnstiles in GS are generally turned off, and the gate is nearly always open (I've accidently walked onto the train without my annual pass on a few occasions here because I usually go through the gate) While putting in the temp ticket office, they managed to move the bike racks while fully loaded with bikes, which I thought was fairly impressive. |
|
![]() |
![]() |
![]() |
#9 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() How many wheels were bent in the process?
__________________
|
![]() |
![]() |
![]() |
#10 |
Member
Join Date: Mar 2008
Posts: 30
|
![]() Greystones Station building now open again. Slightly altered ticket office open and new gates in place. From what I could see there are 4 gates and they were covered in bubble wrap. I expect they will go live possibly at the end of the week or next week. What are the chances that the morning they do go live there will be plenty of ticket problems?
|
![]() |
![]() |
![]() |
#11 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Greystones has plenty of room last time I checked
Bray has a huge amount of room Planning applications for both went in over the summer
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|