Quote:
Originally Posted by Jamie2k9
So a pre planned alteration and reduced capacity. I am going to suggest the reduced capacity is because NIR are down a set after the recent accident. Did IE operate an additional as well from south or border?
The refurb is so far proving less reliable than before, constant entering and removing from service needs to be sorted. Have we even got a week with two units operating full services?
|
The second set is not much more than a week in service. The 0755 from Dundalk is still running which means the 0650 from Belfast has some spare seats when operated by a De-Dietrich set.