Unread 15-11-2012, 19:54   #1
Sealink
Member
 
Join Date: Nov 2006
Posts: 84
Default

There used to be a Clonmel - Heuston service on Sundays many years ago, iirc.
Sealink is offline   Reply With Quote
Unread 16-11-2012, 03:27   #2
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

If a train could be based in Clonmel overnight with local crew operating then the last train out of Waterford to Clonmel to stable for the night could offer additional connections to late Dublin trains. Long shot I know.

If the rumours are true that trains are going to start connecting to Limerick in Thurles then that's a bit of a double whammy for Tipperary town, since they will lose some of their local service and heading over the road to the Junction will mean fewer service choices than hitherto.
dowlingm is offline   Reply With Quote
Unread 16-11-2012, 11:31   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Saying it for ages but what you need is a train every two hours from Galway to Waterford via Limerick, provides way more opportunities

It looks like Dublin Limerick every 2 hours might be coming back which would make anyone traveling to/from points between Thurles and Heuston change at Thurles for the intermediate stops
Mark Gleeson is offline   Reply With Quote
Unread 16-11-2012, 11:55   #4
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by dowlingm View Post
If a train could be based in Clonmel overnight with local crew operating then the last train out of Waterford to Clonmel to stable for the night could offer additional connections to late Dublin trains. Long shot I know.

If the rumours are true that trains are going to start connecting to Limerick in Thurles then that's a bit of a double whammy for Tipperary town, since they will lose some of their local service and heading over the road to the Junction will mean fewer service choices than hitherto.
Thurles as a connecting point for Limerick doesn't make a lot of sense for a number of reasons

Limerick trains would have to use the mainline platforms at Thurles thus re-creating a Malahide style mess on the Cork line. (admittedly at a lot quieter location)

Signalling headways between Thurles and Limerick Junction are of the order of 7-8 minutes thus increasing the interval which would be required between the arrival/departure of Cork and Limerick trains at Thurles as compared to Limerick Junction.

Thurles might make some sense if trains were to split/join although there would still be issues in regard to signalling headways.
Inniskeen is offline   Reply With Quote
Unread 16-11-2012, 21:27   #5
Destructix
Really Regular Poster
 
Join Date: Aug 2011
Location: North Tipperary
Posts: 258
Default

According to staff in Thurles they did hear about this but don't know if it is happening or not. Just got to wait for the new timetables I guess.

Was talking to my cousins partner who works in IÉ. He told me that last week there were a few of track operatives measuring that old siding near platform two in Thurles. Something is happening. Maybe they are building another platform who knows. That would come in handy for the GAA specials they could use that and platform 3 with separate exits and not cause delays for other passengers using the station.
Destructix is offline   Reply With Quote
Unread 16-11-2012, 22:04   #6
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Siding be a bit on the short side, plus you have the old shed in the way

Platform 3, aka the Clonmel branch platform is there but is not accessible for passenger services

Clearly neither option is doable currently and timetable is on a matter of 10 weeks away?

Last edited by Mark Gleeson : 16-11-2012 at 22:08.
Mark Gleeson is offline   Reply With Quote
Unread 17-11-2012, 03:27   #7
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Presumably Platform 3 only comes into play if we're talking about Limerick-Limerick Junction shuttle transfers being moved from Limerick Junction and not merely transfers between Cork-Dublin/Limerick-Dublin trains heading in opposite direction? The Network Statement quotes Platform 3 as being 122m, mind you they also quoted for Roscrea Platform 2 which is similarly out of service.
dowlingm is offline   Reply With Quote
Unread 17-11-2012, 04:12   #8
Destructix
Really Regular Poster
 
Join Date: Aug 2011
Location: North Tipperary
Posts: 258
Default

Platform 3 is easily accessible when you are coming into Thurles from Cork/Limerick side of the track and there are always locomotives and ballast tampers on it and that track was recently relaid back in 2006 wooden sleepers were removed, so safety/weight restrictions on using it shouldn't come into it. Only trains I ever seen pulled into it in 23 years going to that station was a 22k.

The GAA specials Dublin vs Limerick last year. A 3 car 22k GAA service came into Thurles (unusually on the opposite side of the track from Dublin because a few sets of 2700's followed by a mk4 a short time later were using platform 2) the 22k train pulled into platform 3 after it let passengers off on platform 1. The 2700 sets pulled into a siding just past the shed.

The chaos and frustration these GAA specials cause for locals trying to get the train. Delayed my train by 15 minutes because the 2700 took 10-15 minutes unbelievably to leave the platform and pull into the siding.

------------------------------------------------------------------------
To add they also need to open the large gates when these GAA passengers leave the train. They nearly stampede you coming out the small gate. Also some passengers are intoxicated and abusive leaving the station.

Last edited by Destructix : 17-11-2012 at 04:25.
Destructix is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 15:30.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.