|
19-09-2011, 08:48 | #1 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
I very much doubt its a passing loop, if it was it would be much longer 350-400m
The cheap solution to capacity is an intermediate block signal as per Galway Athenry and Bray Greystones which allows two trains in the same direction in a single track section Its probably elimination of a crossing and related works
__________________
Unhappy with new timetable - let us know |
Thread Tools | Search this Thread |
Display Modes | |
|
|