Default Cork Metropolitan Area Transport Strategy (Draft)

I post this here as there are as there are significant rail components
  • New commuter stations on the lines to Mallow, Midleton and Cobh
  • Double-tracking from Glounethaune to Midleton
  • Frequency increases
  • Electrification of Commuter services
  • A Luas-type light rail within the city

https://www.nationaltransport.ie/wp-...y19_SCREEN.pdf

The cynic will say that the stations and frequency increases were in the previous plan and never happened.

I can't personally see the point in double-tracking Midleton. The current arrangement can support up to 4 trains per hour and with two extra stations between Glounethaune and Midleton, it would be easy to create extra passing loops. Double-tracking would be exceedingly disruptive to existing services.
comcor is offline   Reply With Quote
Unread 16-05-2019, 15:17   #2
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

If there were double-tracking and 6tph on the Midleton and Cobh lines, could the junction in Glounethaune accommodate it?

It would mean Midleton-Cork trains crossing Cork-Cobh trains.

What is the maximum number of services that can feasibly cross each other on a level junction?
comcor is offline   Reply With Quote
Unread 22-05-2019, 09:31   #3
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

With good signalling, 6tph on each branch, int each direction, should be no problem. The London Underground sub-surface have lots of level junctions and manage that sort of frequency, albeit with occasional delays and foul ups. The big advantage the line has over the DART is the commuter trains don't have to share with Intercity services.

I think everything in the plan has merit. I don't have a huge amount of hope that it will ever be built, but maybe some day.
James Shields is offline   Reply With Quote
Unread 26-05-2019, 08:40   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The junction issue isn't a problem if you schedule trains to pass at the junction so you schedule a non conflicting arrangement

The plan is reasonable, possibly a bit overstating the demand needs, 6 4 coach trains an hour from Cobh? Thats 6 times the current capacity.

Will it happen? It reads very much like a document produced for Dublin in 1973, which we are still waiting on
Mark Gleeson is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 21:12.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.