Default [Article] Rail tunnel plan to proceed

http://www.irishtimes.com/newspaper/...581467210.html

Quote:
Rail tunnel plan to go ahead - Dempsey

HARRY McGEE

MINISTER FOR Transport Noel Dempsey has said that the underground interconnector between Dublin's docklands and Heuston Station is to proceed as planned in 2009 notwithstanding the deterioration in the public finances.

The Minister described the rail tunnel, which will accommodate an underground Dart line, as the "most critical piece of infrastructure" for public transport in the State.

"We will not get people to use or depend on public transport unless it's totally integrated," he said, adding he was confident the project would finish on schedule and that the first passengers would use the service in 2015.

Mr Dempsey said Iarnród Éireann would apply for a Railway Order, the equivalent of planning permission, during 2009 and it was also likely to begin the procurement and tendering process by the end of next year.

"That process is likely to spill over into 2010. The stage after that is negotiations with the preferred bidder which could take six to eight months.

"All things being equal this time, in two years, we will know the identity of the contractor," Mr Dempsey said.

The underground line will run from Heuston Station to the docklands with stops at Pearse Street, St Stephen's Green and the general vicinity of Christ Church.

The rationale behind the interconnector is to provide a series of hubs that will link all forms of rail travel in Dublin, including the Luas, mainline rail, the Dart, the new underground Dart as well as the proposed Metro North.

Once the service is operational, passengers will be able to switch from one form of transport to another at different levels of the same station, including the major underground station which is earmarked for St Stephen's Green.

The tunnel will also facilitate more rail movements between the north and south of the river Liffey. At present, a single bridge accommodates all mainline and commuter train traffic, as well as Dart services.

"It is integrating all forms of transport. That is why integrated ticketing is also very important. That also needs to be in place if it is to run smoothly," he said.

Mr Dempsey said that planning for the tunnel would continue even in the event of a serious deterioration in public finances.

"Too often in the past what we neglected to do in a downturn was plan for the future," he said.
Mark Hennessy is offline   Reply With Quote
Unread 30-12-2008, 13:01   #2
essoII
Regular Poster
 
essoII's Avatar
 
Join Date: Dec 2005
Location: Co. Wicklow
Posts: 124
Default

I think the only reassuring thing in this article is this quote: "Too often in the past what we neglected to do in a downturn was plan for the future," he said.
At least ministers realize the mistakes in poor future planning that previous governments have made...
essoII is offline   Reply With Quote
Unread 30-12-2008, 16:55   #3
sean
Member
 
sean's Avatar
 
Join Date: Dec 2005
Location: Dublin
Posts: 707
Default

Perhaps this administration isn't a total waste of space after all.
But I'll believe it when I see the Tunnel Boring Machines setting off on their task.
sean is offline   Reply With Quote
Unread 30-12-2008, 17:20   #4
Mark Hennessy
Membership Officer
 
Mark Hennessy's Avatar
 
Join Date: Dec 2005
Location: Maynooth
Posts: 1,116
Default

Quote:
Originally Posted by sean View Post
But I'll believe it when I see the Tunnel Boring Machines setting off on their task.
Bingo.
Mark Hennessy is offline   Reply With Quote
Unread 30-12-2008, 19:36   #5
philip
Member
 
Join Date: Dec 2005
Posts: 632
Default

Aye. No holey holey, no votey votey
philip is offline   Reply With Quote
Unread 31-12-2008, 09:23   #6
KSW
Really Regular Poster
 
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
Default

Is it possible to bring some Heuston services over to Connolly station via the Tunnel, services from Limerick , Galway , Waterford not all just the odd service and the odd Cork service
KSW is offline   Reply With Quote
Unread 31-12-2008, 09:55   #7
Thomas Ralph
IT Officer
 
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
Default

Yes, they all come in the same track as of Kildare. Connolly isn't exactly long on capacity though.
Thomas Ralph is offline   Reply With Quote
Unread 31-12-2008, 14:53   #8
weehamster
Member
 
weehamster's Avatar
 
Join Date: Dec 2005
Location: Cathair Bhaile Átha Cliath
Posts: 199
Default

Quote:
Originally Posted by sean View Post
But I'll believe it when I see the Tunnel Boring Machines setting off on their task.
I'll believe it when I can physically step onto the DART at Killester and get off at The Green.
__________________
R.I.P. T21 Eradicate Fianna Fáil (Totally)
weehamster is offline   Reply With Quote
Unread 02-01-2009, 00:42   #9
Thomas J Stamp
Chairman/Publicity
 
Thomas J Stamp's Avatar
 
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
Default

Lets not get carried away.

Quote:
Mr Dempsey said that planning for the tunnel would continue even in the event of a serious deterioration in public finances.
They have been "planning" it for years. "Planning" will continue. "construction" seems to be a different matter.
__________________
We are the passengers
Thomas J Stamp is offline   Reply With Quote
Unread 03-01-2009, 00:14   #10
Derek Wheeler
Registered user
 
Derek Wheeler's Avatar
 
Join Date: Dec 2005
Location: Kildare
Posts: 1,555
Default

They planned the M50 for 17 years before construction started. Planning isn't expensive. Construction is the bogey. I'll stay on the side of disbelief.
Derek Wheeler is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 12:20.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.