Quote:
Originally Posted by ACustomer View Post
Jamie2k9: I don't quite buy the extensive engineering works excuse/explanation. These works mean that there are revised timetables to take account of them: failure to meet revised schedules is not really acceptable.

There are approximately 900 Cork-Dublin and Dublin-Cork intercity trains per month. A 12 percentage point deterioration in punctuality means about 100 extra trains being late. IE have a case to answer here.
Remember after engineering works there is usually a temporary speed restriction for 4-7 days in many cases.

There are currently 4 TSR on Heuston-Cork, 2 on Cork-Heuston and they have been on rolling basis (different areas) for a few weeks now. Westport/Galway have had the same in recent weeks.

You are correct the performance is particularly bad and yes something needs to be done to address it.
Jamie2k9 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 12:00.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.