Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > General Irish Rail Discussion
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
Unread 20-06-2019, 08:12   #1
James Howard
Really Really Regluar Poster
 
James Howard's Avatar
 
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
Default

In Germany, I noticed that a lot of the regional trains are made up of carriages hauled by electric locomotives. Would this not be a reasonable approach for Irish Rail to adopt? It seems to me that the current focus on DMUs for everything ignores the fact that that you're effectively tying the network into diesel over a 30-40 year lifespan unless you throw everything away and start again. I'm guessing that this approach only works for regional and intercity use.

Irish Rail do have history in multi-annual programmes to reduce costs. Look at the steady progress in removing manually operated level crossings over the last 10 years or so. You eventually get to a point where the operational savings fund the remains of the programme. Unfortunately this doesn't work if you're throwing away rolling stock with 20 years of life left.

In any case when you combine the implications of retiring perfectly good trains early and the fact that we're still burning massive amounts for coal and peat for power generation, the CO2 savings of electrification are marginal at best. You'd probably get better overall CO2 savings by investing in boring stuff like multi-mode integration, capacity, new lines (both light and heavy rail) and shorter journey times since you'd be taking more cars off the road by providing a more attractive alternative.
James Howard is offline   Reply With Quote
Unread 20-06-2019, 08:54   #2
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

In reality some lines will not be electrified in our lifetimes and something else will be needed.

Even if you look at a country like The Netherlands, in remoter (and by Irish standards they are not remote at all) areas of the north, trains are still diesel. Although they are starting to experiment with hydrogen powered trains.

Electrification can probably be justified on Dublin and Cork commuter networks, Dublin-Cork, Dublin-Belfast and Limerick Junction-Limerick.

Even if we go beyond, it will be a long time before it happens, so alternative power sources will be required. However, the Dutch example shows it doesn't have to be diesel.
comcor is offline   Reply With Quote
Unread 20-06-2019, 10:40   #3
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

The article linked above highlights the German approach which has been to electrify roughly 200km of single line track per year for nearly 70 years. The obvious advantage of that approach is that they can keep knowledge and equipment in-house, and instead of breaking up the project team at the end of a project, they can simply move on to the next electrification project.

If we took a similar approach to electrifying the Dublin area, with perhaps a more modest goal of 50km per year.

If there was a commitment to electrify the Dublin Cork line after the Dublin area, that could be planned while Dublin electrification was taking place, and the same team could move on to the project. By retaining skills and equipment, and exectrifying at a consistent rate so that the team wouldn't have to go through expansion and reduction for different sized projects, there should be significant savings over a more piecemeal approach.

I believe there are plans for the 201s to be re-engined. Perhaps they could be converted to Diesel-Electric engines with pantographs for bi-mode running, or perhaps new bi-mode locomotives would have to be bought, but the Mk4s should be able to be retained. It might take 8-10 years to electrify all the way to Cork, but the diesel generator of the locomotive would need less and less use as it progressed.

Some bi-mode DEMUs could also be bought for lines that run part way on the Dublin Cork tracks, and when electrification reaches other cities, new EMU stock could be introduced and the bi-mode stock cascaded onto lines that were partly electrified.

Sadly I see little chance of there being anything planned beyond the Dublin area, but I can dream.
James Shields is offline   Reply With Quote
Unread 23-06-2019, 13:21   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

201 project has been cancelled.

Rail is very efficient to start with, so very little change is needed.

The ICR/22k fleet is likely to get the new gearbox/stage V engine/hybrid drive combo which will deliver a reduction in fuel consumption, improved performance and emissions reduction. That would make them the cleanest and most efficient of there type in use anywhere.

Electricifcation would be great but beyond Dublin and Cork we don't have the traffic density, there is a 30 miles section of the Dublin Cork line which has only 1 train an hour in each direction. You have to get the electricity from somewhere and thats a problem.

The Germans are quickly eliminating local hauled short set operation with EMU's, but for long distance and high capacity short distance they are still going with loco + coaches, but those locos are 8000hp, 3 times our 201
Mark Gleeson is offline   Reply With Quote
Unread 24-06-2019, 12:03   #5
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

Thanks, Mark.

What frequency is needed to make electrification viable? I've seen some quite low frequency lines in France and Germany that have been electrified.

I agree rail transport is already pretty green, and there are various other options for making it carbon neutral (batteries, hydrogen, bio-fuels).
James Shields is offline   Reply With Quote
Unread 24-06-2019, 18:52   #6
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

The Climate Action Plan is quite radical and ambitious when it comes to emissions form home heating, electricity generation and private car transport: items which are likely to involve tens of Billions of € in costs. By contrast, the ambitions for public transport are pathetic: a few extra and longer trams for the LUAS (announced previously) and virtually no mention of heavy rail, apart from things already announced such as hoped-for tendering for new rolling stock..

If we are serious about radical reductions in CO2 emissions then there will have to be really big changes. A really heavy carbon tax will advantage rail transport in general, if it is already relatively low emissions. This should lead to a significant switch from bus to rail and especially from private cars to rail. We should be thinking of a really large change which will bring the capacity of the rail system into play. So it’s not just a matter of electrification, but also of line capacity and investments in such items as better signalling, track doubling, extra passing loops and so forth. There is absolutely no indication that the powers that be are thinking about these issues.

There is a hugely disappointing pattern of announcing plans and then cancelling them or letting them wither on the vine, such as refurbishing the 201s (U.S. railroads get very long life form locomotives and a lot of big refurbishments are part of this). Similarly, is there any real action on the supposedly urgent need to lease (or buy?) 40 second-hand DMUs from the UK? Or has this too fallen victim to bureaucratic wrangling between the NTA, the DoT, Irish Rail and maybe other bodies?

At the centre of this is that we have a Minister for Transport who has absolutely no vision, no ambition for transport and no real leadership qualities, and an NTA whose projects (Metrolink and Bus Connects) seem to be designed to provoke maximum opposition.

So while I think electrification (assuming much greener electricity is delivered) is important, the public transport malaise is a much wider issue.
ACustomer is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 04:17.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.