![]() |
![]() |
#61 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Charlemont situation is going to be very messy
The line will have to be 3m below road level and then rise to 5m above, so 8m, 1 in 25 give you 200m needed and since platforms have to be level all this happens after the stop, so going to result in one or more permanent local road closures. Some fairly ugly CPO here Note the alignment avoids the former Irish Nationwide building which of course is being knocked and rebuilt, of course it would have been so much easier to do the station and the building together... The tie in will require the demolition of the existing embankment so there won't be any Green line trams beyond Beechwood for a long time while this is done I have very little trust in the drawings they are very much draft, didn't see anyone out there taking core samples to investigate the ground conditions
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#62 | |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
![]() It gets worse...
From Irish Times, "Dublin Metro may require homes to be demolished": Quote:
Does anyone here think any of this is a good idea? |
|
![]() |
![]() |
![]() |
#63 | |
New to the board
Join Date: May 2016
Posts: 13
|
![]() Quote:
Better in the short term to provide BRT orbitals to the rail lines and increase frequency on the dart service and maybe two north south BRT routes to. This all hinges on a linked up Train service which brings us back to the underground link. The two seperate green lines could be rationalised, by connecting to Shankill Dart from brides glen and to suir road from harcourt (south circular road) Last edited by platypusparcel : 26-03-2018 at 08:46. |
|
![]() |
![]() |
![]() |
#64 |
New to the board
Join Date: Apr 2013
Posts: 16
|
![]() There should be a Rail freight yard in Mallow. A right turn at Mallow junction to enable a proper high-speed commuter service for the southwest would be nice.
Build a station just above shaws bridge send a train line to the west.it crosses the M20 just above black stone bridge build a park and ride in the field there . Advance the line to a station in Hollyhill industrial estate continue to Wilton united soccer field build a multiuse stadium there with a big car park use as a park and ride. Cross the Lee and continue down to the RTC and build a station on the back of the football pitch . Continue down to Cork greyhound stadium and cross the ring road there extend down to the airport future growth options. Continue down to the north of Carrigaline park and ride there and finish the line underneath the cranes of the deepwater port. For Dublin extend the Luas to Bray train station next 5 years . Build a spur line from dart to the airport 5 years . Build Swords line and extend down to Glasnevin 10 years. Extend the dart up the Luas line next 10 years. 15 years connect the two lines. Build Kishoge freight yard when Mallow is being built fix the lines in Dublin port. 15 years electrify the cork line and cork commuter lines. In 17 years build Claremorris and Faranfore wood yards. In 20 years build the interconnector . |
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|