03-12-2007, 12:49 | #41 |
Member
Join Date: Dec 2005
Posts: 132
|
I use the station every day, its not great at all, empty at night with the industrial estates round the place
Like I have said in another thread, the Luas BX line looks for definitive to be ending up at Broombridge, after coming up the old Broadstone line. I've heard elsewhere that hopefully the new station at Royal Canal Park should start construction early next year, even January. I live in hope |
05-12-2007, 10:30 | #42 |
Regular Poster
Join Date: Jul 2006
Posts: 30
|
Could someone tell me where exactly the new station will be - more so
interested in the necessary work for the Ashington side of the station ? Tks |
06-12-2007, 20:11 | #43 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
Quote:
Suggested Royal Canal Park Existing Broombridge Suggested Liffey Junction |
|
07-12-2007, 15:21 | #44 |
Member
Join Date: Dec 2005
Posts: 132
|
Was at a residents meeting last night in Finglas South, there seems still to be a lot of resistance still from the people on the Cabra side of the Campbells Bridge level crossing about the flyover plans etc.
I asked the councilors you attended the meeting if the Ormond site had or would be purchased by DCC. They said it hadn't and I said it should be CPO'ed or something similar. Don't know how much that would cost but I think it would give a lot of space over to building the flyover which is badly needed. I'm no engineer but if that site was bought, could the flyover design be built in such a way so that the cars travelling over it would not overlook the housing estates on the Cabra side? |
07-12-2007, 19:30 | #45 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
Might be possible to build a willow-earth-willow sound barrier installation so that it looks green to those overflown and blocks the view from the overflyers.
It would look better than an ugly concrete barrier, maybe lighter weight for the flyover to carry too. |
07-12-2007, 23:06 | #46 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
Is Campbells Bridge the one on Ratoath Road?
|
09-12-2007, 22:22 | #47 |
Registered user
Join Date: Dec 2005
Location: Kildare
Posts: 1,555
|
Yes.
The one leading to Reillys level crossing. The Ormond factory is the old Sellotape factory on the left as you approach the bridge from the Finglas side. The tyre/service garage is named Campbells. Its on your right facing Ormonds. The Cabra residents are objecting because any proposed flyover will have decent views into bedrooms in the estate on the Cabra side of Reillys crossing. |
11-12-2007, 19:26 | #48 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
|
25-02-2008, 17:36 | #49 |
New to the board
Join Date: Feb 2008
Posts: 1
|
I live in the area and WOULD LOVE to see that built, that crossing is the Bane of my life . every time I try to get anywhere the damn gates are closed. and if I try to take the train I cant get on the thing!
Id a polish taxi driver giving me a lift home once and he was in fits of laughter at how backward it is to have someone opening and closing those gates. Its completely ridiculous that its in that state. Does anyone know if there is a time frame in place for that bridge or is it like every other piece of infrastructure in the country and 'proposed' hahaha |
25-02-2008, 17:43 | #50 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
Its all in the hands of the local authority
The gates where not automated when the line was rebuilt in 1998/1999 due to the awkward curve on the approach, the canal bridge hump and plans to put a bridge in to close the crossing Automatic gates cost about €700,000 to install, require frequent maintenance, the bridge option is typically cheaper and lasts tens if not hundreds of years
__________________
Unhappy with new timetable - let us know |
25-02-2008, 18:13 | #51 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
Automated crossings don't really offer any advantage except from a staffing point of view. Look at the ones on the DART, and if anything the gap between the gate closing and the train passing is even longer.
|
13-04-2008, 18:45 | #52 |
New to the board
Join Date: Apr 2008
Posts: 1
|
Fly over at reillys bridge
I grew up in the estate where the fly over is suppose to go,since my parents bought the house in 1971 the fly over has been in the pipework.the land is there and there has never been any objection to it being built as the residents knew it was planned.Only now is there objections as most of the original residents have moved on after 37 years so the new homeowners are objecting which is ridiculous because after 37 years of planning you think permission would have been approved by now.Bring on the fly over,level croosing in 2008 is crazy
|
02-05-2008, 15:43 | #53 |
New to the board
Join Date: May 2008
Posts: 1
|
ratoath road level crossing
Hey
I used to work in that crossing, and i agree its ridiculious, but none of the raod users understand how much hassel and hardship the staff go through on that bridge!! from all the verbal abuse and getting pebbeled with stones working 12 hours a day running in and out like a mad man, its **** on all sides of the agenda, anyone have any quearies about that id love to know!! |