![]() I think we are down to Prague as being the nearest capital without a rail connection to its airport (Ok Bern doesn't but Bern is a bit of a fudge). Its embarrassing.
There is no EU money for metro to Airport, there is for heavy rail under EU TEN. I've been in touch with a engineer who was involved in the development of the original interconnector concept. Furious doesn't describe it. The business case fudge is a classic game of make the numbers look bad by being selective.
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#22 |
Really Really Regluar Poster
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
|
![]() It sounds as if the potential solution here would be quite similar to Lisbon. The idea of a airport spur or a mainline reroute to go through the airport would work fine with the interconnector in place.
We are all too much in love with our cars in Ireland. We can't see the value in paying a bit a bit more tax so that we could get by without the need for a family to own two cars. When I lived in Dublin, by far the most viable way to make the 30 km daily round-trip from Lucan into work was by bicycle. This is still the case and is likely to be the case for at least the next 15 years. And that was a direct link. Here is an amazing journey time for a student from just beyond the western edge of the city. Hazelhatch to Sydney Parade typically takes just under 2 hours. Using Google maps, the same journey takes 1 hour 15 minutes to cycle the 23 km. This is just an absurd journey from a town so close to the city to the station for the city's biggest university. How much economic damage is being done by the lack of a working transport system in the city? Everyone thinks I'm made to commute from Edgeworthstown to Dublin but aside from the absurdly early last train, it is a far more viable commute than that available for a lot of people on the Kildare line. I suppose that the PPT should help that dramatically but it is going to make the morning schedule very brittle. The airport issue is a bit of red herring in ways. Aside from the people who work there, most people take a trip to work a lot more often than a trip to the airport so the lack of a railway link is more of an embarrassment to the country than a practical problem. It is unlikely that an airport train would be any quicker than the bus services that use the port tunnel in any case and for people travelling to the West and North, Bus Eireann provide an excellent service from the airport. |
![]() |
![]() |
![]() |
#23 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() James, how does it take two hours to get from Hazelhatch to Sydney Parade - say 20 to 30 minutes to Heuston, 15 minutes Luas to Abbey Street, 12 minutes train Tara Street to Sydney Parade, 20 minutes walking and waiting, at most an hour and seventeen minutes.
Journey times by rail in the Dublin area are slow and will remain so until smarter operating are adopted and some serious infrastructural investment takes place. While DARTunderground would shorten some journeys off the Kildare line, the least used of the four main routes into Dublin, many other passenger particularly on the northern line, would face significantly increased journey times and multiple changes. Last edited by Inniskeen : 25-09-2015 at 17:33. |
![]() |
![]() |
![]() |
#24 |
Really Really Regluar Poster
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
|
![]() That's what I got on google maps but maybe it was being a bit mad. In any case, that still leaves you with a 20 minute walk to the UCD (I picked UCD as a popular destination for public transport) so the end-to-end journey isn't so different.
|
![]() |
![]() |
![]() |
#25 |
Really Regular Poster
Join Date: Jan 2006
Posts: 767
|
![]() Inniskeen: Dart Underground would not only shorten journeys from the Kildare line: it would enable a huge potential new housing area in the Adamstown/Kishogue/Clondalkin area to expand and have quality access to the city. It would also (indirectly) be a solution to some of the bottleneck problems at the North end of Connolly.
A big reason why the Kildare line is the least used of the 4 main commuter routes are that there is so much unbuilt potential development land within 10 miles of Heuston crying out for development with the present housing shortage. Dart underground would make this area much more attractive for development. |
![]() |
![]() |
![]() |
#26 | |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
![]() Quote:
The Northern Line needs something major in the coming years and it's probally the biggest cash cow for Irish Rail and there has not been a shred of forward planning. Dart Underground does nothing worth while for it. Malahide heading south needs 2 more tracks. The KRP has nothing to do with lack of housing development. With services to Heuston and now the PPT it is a reasonable service standard. If there was some additional underground lines in Dublin City Center (Spencer Dock-Pearse/GCD) electrifying PPT along with Hazelathch/Maynooth could be a decent solution for a long while and a reasonable cost something I suspect the NTA may be thinking by stopping DU. Is there really a need for a second tunnel to Heuston? Last edited by Jamie2k9 : 26-09-2015 at 00:37. |
|
![]() |
![]() |
![]() |
#27 |
Chairman/Publicity
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
|
![]() people like brands.
bring DART to the hatch and you will see it packed, like the Luas. coming in on the 4 tracks all I can see are thousands of acres of land which can and should be developed and would be if there was DART from there right into the heart of the citu using DART underground. People wouldnt have to resort to portarlington, portlaoise, templemore or thurles to live and commute to the city - where they must be confind to work within a short bus/luas trip from the terminal station in any event. They could live and have a better life in the area from adamstown in. DART underground also opens up employment possibilities for those further out in mnay different parts of the city rather than a narrow corridoor from Heuston to Connolly. It also links up everything. but in order to promise something new you have to dump something. So we have Metro North/Airport announced for the second time in 10 years and this is supposed to be progress. I'm in my mid 40's and i am starting to think i will be retired before any of this is built. |
![]() |
![]() |
![]() |
#28 |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
![]() 1 - Metro North (2021-2026) - Stand by for the third announcement for election in 2021.
2 - DART to Balbriggan (2022) - No date in the doc issued 3 - New CTC center 4 - Funding for Ongoing maintenance to ensure the safety and efficiency of the rail network 5 - Design/Planning for DART to Hazelhatch/Maynooth Staggering that almost 50% more will be spent on roads per year than public transport. Only other part which may be of interest: In advance of the Mid Term Review, the Government will commission a feasibility study to examine options for expanding freight transport on the railways. https://static.rasset.ie/documents/n...-for-print.pdf So in a nutshell not a single penny been invested to improve any intercity routes! Last edited by Jamie2k9 : 29-09-2015 at 15:51. |
![]() |
![]() |
![]() |
#29 |
Member
Join Date: Mar 2006
Posts: 112
|
![]() What causes this fudging and binning of projects is simply that farmers, estate agents and those who make money out of road construction have the ear of the Permanent Government.
It is a lot easier to run with five year lead time projects like motorway building that make money for the people mentioned above, than it is to push through any rail project. Rail projects justify themselves when spatial planning concentrates on high density, urban development for an expanding population. The dirty secret is that any rural Irish town could be redeveloped for an expanding population but it doesn't suit Official Ireland to plan ahead for a population of ten million plus and the sustainable economy that would by necessity result from that. It is a lot easier to run the place with a periodically shrinking population through death and emigration, because those who have the ear of the Civil Service and most politicians are comfortable enough with things as they are. Hence rural sprawl and urban congestion. Sure its part of what we are ![]() |
![]() |
![]() |
![]() |
#30 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() Quote:
__________________
|
|
![]() |
![]() |
![]() |
#31 |
Really Really Regluar Poster
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
|
![]() Does the PPT have enough headroom for electrification? From this image it would not appear so.
![]() If it were possible to electrify the PPT, then possibly combined with a major re-organisation of Connolly it might be possible to have it operate as an interconnector. Given the amount of yard space in Connolly, would it not be a relatively simple matter to add a couple of platforms that could be dedicated towards terminating northern or Maynooth line services? This would enable DART frequency to be increased to the point where people wouldn't mind changing trains. By relatively simple I mean relative to the expense of digging out a tunnel right through the city centre. |
![]() |
![]() |
![]() |
#32 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Tunnel yes, bridge at Conyngham Rd no
Routing everything to Connolly would be a nightmare as you then would have 4 inbound routes (Maynooth/Kildare/Drogheda/DART) and only one outbound The DART underground provided separation to avoid conflicts and paired off the routes
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#33 |
Really Really Regluar Poster
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
|
![]() I'd rather see DART underground built but given that this is unlikely to start for at least 10 years, it would be a good idea to start looking at alternative options in the meantime.
For example, a major issue with public transport in Dublin is the lack of fare integration. With Luas from Broombridge, that opens up a lot of options but only if there is proper fare integration. It should not really cost a passenger any more to transfer onto Luas to get to O'Connell street than it costs to stay on the train to Connolly as it is the same distance. Proper fare integration would cost nothing and would make the entire system a lot more useful. But now they'll be adding yet another brand and operator to the mix. But give it another couple of weeks and they'll give up on Metro north and bring back DART underground. Last edited by James Howard : 01-10-2015 at 12:38. |
![]() |
![]() |
![]() |
#34 | |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() Quote:
Further many, if not most, of existing northern line users will be forced to make at least one change to reach their destination thus further adding to journey times and creating another dis-incentive to usage. The effect of miserably slow journey times can be seen at south eastern line stations south of Greystones where usage has declined significantly, particularly since the introduction of the half-hourly DART services to Greystones. Last Monday after the morning peak there were no more than twenty cars in the large car park at Arklow, a good indication of light usage and probably a good predictor of future usage at outer suburban stations beyond Malahide. As for the mooted spur from Clongriffin to Dublin Airport this makes little sense in the context of congested infrastructure as in the absence of express or semi-fast services trains would not be competitive with buses running via the port tunnel and hence be likely to attract only minimal patronage. |
|
![]() |
![]() |
![]() |
#35 | ||
Really Regular Poster
Join Date: Sep 2009
Posts: 258
|
![]() Quote:
Quote:
As an occasional user of the private bus company that shuttles between southside Dart stations and the airport, I'd be happy to switch to the train if there was one available. I imagine the journey time would be pretty much the same. However, I might revise that if the train dropped you a long way from the terminals, as buses do currently enjoy a big advantage in being able to drop you off right outside the terminal buildings. |
||
![]() |
![]() |
![]() |
#36 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
![]() As I understand the proposal for DART to Dublin Airport, the Airport station would be some distance from the terminal buildings.
While Metro North would probably be no quicker than DART, the airport is only one stop whereas for DART the spur will depend almost exclusively on airport traffic. Given the extraordinary time scale for the delivery of Metro North and the deferral of DART Underground there would appear to be plenty of time to review both projects together and perhaps consider a DART (or Metro) from Hazelhatch via Heuston, St Stephen's Green to Dublin Airport, Swords and Donabate. Solves the Heuston problem, relieves the northern line and leaves capacity at Grand Canal Dock for Maynooth and northern line services. |
![]() |
![]() |
![]() |
#37 |
Chairman/Publicity
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
|
![]() Where does the new Rapid Bus thing fit in with the Metro from the airport?
Surely it is almost an identical route? |
![]() |
![]() |
![]() |
#38 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() (re: PPT electrification)
diesel/electric units operating GCD-P10-Hazelhatch-beyond could raise and drop their pans... wouldn't be cheap though! via Wikipedia https://fr.wikipedia.org/wiki/B_81500 |
![]() |
![]() |
![]() |
#39 | |
Chairman/Publicity
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
|
![]() Quote:
we are, of course, a better organisation than to drag up all of the occasions where CIE/IE have flatly stated to us that the PPT cannot be used for passenger trains. In fact more than stated, but have slated and ridiculed us for suggesting it in the first place.... |
|
![]() |
![]() |
![]() |