19-12-2015, 21:16 | #21 |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
Both on the line between Belfast and Coleraine. I don't know what caused this morning's failure
__________________
26271 12-60 |
20-12-2015, 08:45 | #22 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
The biggest single source of disruption on today's railways are signalling failures. Some of these are minor but any event that requires the suspension of services is major and disturbing. There are occasions when a partial suspension is the appropriate response as a degraded signalling system can such such delays as to make suspension the lesser of two evils.
This, like so many other handicaps of modern railway operations, is something which was virtually unknown on the traditional railway where signal box failures were generally confined to a fire or structural collapse. Irish Rail from the same phenomenum with Heuston, Kildare, Portarlington, Clonsilla, Maynooth and DART locations featuring on a reasonably regular basis. Last edited by Inniskeen : 20-12-2015 at 09:00. |
20-12-2015, 10:26 | #23 |
Regular Poster
Join Date: Dec 2015
Posts: 130
|
The other problem especially in Dublin is the fact that we have two line two platform stations everywhere so when something breaks down it blocks pretty much everything and everything gets stuck. The infrastructure for turn back and refugee / recovery sidings is woefully underdeveloped, it's a joke that in a capital city one train breaking down can take down the entire network.
If you remember following culture night in 2014 there were MANY signal failures at a regular basis at exactly the same time of the day for several weeks before they eventually called some external experts in to look at it and apparently they found the problem very quickly. |
20-12-2015, 13:08 | #24 | |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
Quote:
I wouldn't say Heuston side features very often, granted Portarlington went down on Wednesday (late night) but there has been no major disruption since the ESB failure at Kildare a few weeks ago and prior to that I can't recall another recent one. |
|
20-12-2015, 19:16 | #25 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
I thought Sallins was in trouble in the last few weeks, Blakestown last Monday and DART at least once last week (not Merrion).
|
20-12-2015, 22:53 | #26 |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
Think that was a train fault a few weeks ago, even if a signal issue I wouldn't put Heuston into the same box as the disasters which happens through Connolly week in week out whether it be signal/bridge/LC been hit/medical issues etc.
|
21-12-2015, 19:08 | #27 |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
Signal failure at Raheny caused delays this morning
__________________
26271 12-60 |
22-12-2015, 11:09 | #28 |
Really Regular Poster
Join Date: Oct 2006
Location: Celbridge
Posts: 259
|
There are delays on the Heuston route each week ie signalling issues, technical issues, we get the same 'old apologies' the 07.52am train from Hazelhatch to Heuston hasn't run on time for about 2 weeks - it showed up this morning about 15mins late. Perhaps when the new timetable is published it should have printed of the front "The Fairy Tales of Ireland" - turn up on the hour and on the half hour you might catch a train.
|
22-12-2015, 13:17 | #29 |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
more signal failures
Two for the price of one it seems:
Delays of up to 25mins to DART services due to signal fault in Bray, services currently suspended between Bray/Greystones. [1 hour ago] Update: Services have resumed between Bray & Greystones following earlier signal fault, delays of up to 25mins to DART services as a result. [ 37 min ago ] Update: Delays of up to 30mins to DART services due to signal fault in Bray, services currently suspended between Bray/Greystones. [ 3 min ago ] as of 1331 Dublin time 22.12.2015
__________________
26271 12-60 |
22-12-2015, 14:03 | #30 |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
Last time I posted something positive about IE there was a spate of signal faults again. Maybe next time I will say nothing.
|
22-12-2015, 14:18 | #31 |
Regular Poster
Join Date: Dec 2015
Posts: 130
|
Lets hope it doesn't turn into a repeat of what happened in late Autumn / early Winter last year when faults at the same place appeared over and over again
|
23-12-2015, 11:48 | #32 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
The issue last year was a very specific issue, GE Signalling had to fix an issue with the code. That issue will never happen again, the signalling system was fully functional at all times, just that running it without a computer isn't fun
Water and track circuits don't mix and that generally is the problem
__________________
Unhappy with new timetable - let us know |
23-12-2015, 15:14 | #33 | |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
Quote:
Anyway back to the refurbished enterprise. 1405 left Belfast 26 late due to mechanical problem on set and is currently showing 29 late at Newry
__________________
26271 12-60 |
|
23-12-2015, 16:00 | #34 |
Regular Poster
Join Date: Dec 2015
Posts: 130
|
It missed out Lisburn as well.
|
23-12-2015, 16:30 | #35 |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
32 late ex Drogheda. Problem this time was failure of locomotive 206 at Belfast Central, 208 was brought from the depot to replace it
__________________
26271 12-60 |
23-12-2015, 16:38 | #36 |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
37 late now meaning ETA 1654. 1650 Belfast will be at least 10 late
__________________
26271 12-60 |
23-12-2015, 16:42 | #37 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
Just gone through Malahide at 1640 directly behind a local from Drogheda which in turn is directly behind a DART. Return 1650 will probably be at least 20 minutes late and maybe double that by the time it gets to Drogheda. Yet again the lack of overtaking facilities compound the original delay.
1520 to Belfast delayed by DART failure at Killester. Last edited by Inniskeen : 23-12-2015 at 16:48. |
23-12-2015, 17:12 | #38 |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
IE Real time shows 1650 23 late passing Clontarf Road
__________________
26271 12-60 |
23-12-2015, 17:59 | #39 |
Regular Poster
Join Date: Dec 2015
Posts: 130
|
I actually got to Clongriffin tonight and on getting off heard the sound of a loco before the doors even opened on the DART.
At first when I heard the sound before I saw anything, I fully expected to see the enterprise carriages attached but it was just on it's own and appears to be waiting for something in the loop platform. The failure of a DART explains the odd sighting of a 4 car DART going southbound out of service at Raheny, I guess it turned back at Clongriffin. thank god for the loop there, even if it's only one way. Last edited by Dublin13 : 23-12-2015 at 18:02. |
24-12-2015, 15:59 | #40 |
Really Regular Poster
Join Date: Oct 2007
Posts: 279
|
Just noticed 0800 ex Belfast was 27 late today but no idea why