Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Intercity and Regional > Galway - Limerick - Waterford - Rosslare
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 06-01-2018, 09:03   #1
Eddie
Really Regular Poster
 
Join Date: Sep 2009
Posts: 258
Default Too many staff?

Travelled last week one day on the 16.25 Waterford to Linerick Junction train.

About 40-50 odd people I'd say used the service - more than I expected.

One thing that struck me was the number of Irish Rail staff I saw eg manning level crossings adjacent to the stations. How many are there for the 4 trains that go each day? I would have thought key to this line's survival would be complete automation with the only staff required being a driver and a guard to collect fares.
Eddie is offline   Reply With Quote
Unread 06-01-2018, 18:28   #2
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Originally Posted by Eddie View Post
Travelled last week one day on the 16.25 Waterford to Linerick Junction train.

About 40-50 odd people I'd say used the service - more than I expected.

One thing that struck me was the number of Irish Rail staff I saw eg manning level crossings adjacent to the stations. How many are there for the 4 trains that go each day? I would have thought key to this line's survival would be complete automation with the only staff required being a driver and a guard to collect fares.
Yes this and Limerick-BallyB have a lot of staff required to operate crossings, signalling on these lines. Automation of crossings is circa €1m per crossing and suspect the old signalling system under local control would create problems automating crossings.

In recent years Limerick J-Tipp Town has come under central control but that was probably the easiest section to address at low cost.

The reason there is no services during the day on both regional lines is they operate a split shift, operating during the day would result in two separate shifts for staff.
Jamie2k9 is offline   Reply With Quote
Unread 07-01-2018, 01:48   #3
Eddie
Really Regular Poster
 
Join Date: Sep 2009
Posts: 258
Default

Interesting ... so this is why you see massive subsidies per passenger journeys on some of these lines. You bring in low revenues, in part because you only operate twice a day and you operate twice a day because you don't make the capital investment to automate the signalling and crossings.

Presumably Wexford to Waterford also relied on a similar workforce, and the high per passenger subsidy was a key reason for its demise?

Are there other higher frequency lines that rely on significant staff numbers to operate the service?

I've had a look a 2011 census and Clonmel which is on this line would appear to be one of the most populated towns in Ireland (18,000) that has an existing station but with the least frequent train service. On the other hand, for its 8,000 inhabitants, Thurles must have one of the best. My guess would be that a frequent fast link from Clonmel to Limerick Junction to connect with Cork and Dublin trains would significantly increase rail useage from the town.
Eddie is offline   Reply With Quote
Unread 07-01-2018, 15:43   #4
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Most of lines have only the odd attended crossing (roughly Waterford 2, Cork 4, Limerick 3) while I think Sligo, WRC, Tralee are now fully automated. With funding issues conversion to automatic has almost stopped, many 1-2 a year now where it would of been much higher towards end of 2000's. One person per shift been able to control each route's crossings is a big saving.

Yes Waterford/Rosslare had the same problem and it's difficult to balance service improvements and costs.

Most people go to Limerick J, Kilenny or Waterford to take the train from South Tipp, it would probably make no difference if they routed towards Limerick J or Waterford in terms of journey times.
Jamie2k9 is offline   Reply With Quote
Unread 08-01-2018, 09:48   #5
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

I can't find a link to this now, but I have a memory that when Waterford-Rosslare closed it was reported that it was losing €4m a year of which €2.5m was the cost of manual level crossings. It seems a bit high considering there were only 12 crossings of public roads on the route.

Although it's more expensive than automating a crossing, surely the ideal is to build a bridge as it doesn't require signalling adjustments. Although it's not always going to be practical (e.g. the old Bridgetown crossing on Rosslare-Waterford was right in the middle of the village) and is made harder by the fact that crossing-keeper's cottages were often built next to the line.
comcor is offline   Reply With Quote
Unread 08-01-2018, 12:02   #6
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Level crossings are being replaced but its working through based on priority and also future plans. So if there are plans to build a bridge or close a road the manual gates remain (see Maynooth line)

So Dublin Rosslare/Galway/Westport/Waterford should be 100% automatic. Dublin Cork has a small number left which are being slowly eliminated.

The capital cost is about 1 million each and an ongoing maintenance cost, its generally rolled into the capital cost of signalling upgrades

Last edited by Mark Gleeson : 08-01-2018 at 12:19.
Mark Gleeson is offline   Reply With Quote
Unread 08-01-2018, 14:41   #7
Goods
Regular Poster
 
Join Date: Aug 2017
Posts: 117
Default

Running down the service is step one and then the drop in passenger numbers is used as a reason to reduce volume on the line and finally closure is next. The only country where auto crossings appear as an issue is Ireland , abroad in many countries including France there is hardly a fencing along the lines yet here because of legal interests in running into court rail lines are protected in the extreme. Waterford to Rosslare was an important link, then again I suppose Cork to Rosslare was too before that closed as well.
Goods is offline   Reply With Quote
Unread 08-01-2018, 15:32   #8
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

Mallow to Rosslare

If it had gone Cork-Waterford-Rosslare, a Cork-Waterford section would probably still be hanging on, in the same way that Limerick Junction-Waterford is. Unfortunately, as Youghal was built as a terminus station, in a location where it was next to impossible to cross the Blackwater, a Cork-Waterford link was never possible by joining Youghal to Dungarvan, and splitting after Midleton to go via Lismore would have been second only to Bray Head in terms of Irish railway engineering challenges.
comcor is offline   Reply With Quote
Unread 08-01-2018, 21:48   #9
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

Mallow-Waterford had literally dozens and dozens of level crossings which would sooner or later have killed it off. Great for scenery, but not much regular passenger potential.
ACustomer is offline   Reply With Quote
Unread 09-01-2018, 14:28   #10
Goods
Regular Poster
 
Join Date: Aug 2017
Posts: 117
Default Mallow-Waterford

On the contrary this was the route linking Kerry/Cork to Rosslare and vice versa and was also a fast freight route to a port. The line was heavily used during the beet season moving beet from the rich south east to the sugar factory in Mallow all linked directly to the factory by rail. In our brains we shut down all the beet factories and now import sugar, a double loss. Along the route you had busy towns like Fermoy, Lismore, Cappaquin, Dungarvan and Waterford. The route ran along the spectacular Blackwater and was a treasure and would have had value today in taking container freight off the roads. Mindless destruction of national asset.
Goods is offline   Reply With Quote
Unread 09-01-2018, 16:27   #11
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

The beet went via Limerick Junction. I believe Mallow-Dungarvan closed in 1967, when beet from the South-East would have gone to Carlow (or maybe even another site back then).

Anyway, the status of long-closed lines shouldn't really be the point of this thread. The discussion should focus more on areas where capital expenditure can be used to reduce operational expenditure and improve the viability of marginal lines.
comcor is offline   Reply With Quote
Unread 09-01-2018, 17:32   #12
Goods
Regular Poster
 
Join Date: Aug 2017
Posts: 117
Default

Google YouTube and see the beet trains on the line to Mallow.
On capital expenditure, the idea that auto gates cost a million each seems to be a bit rich or else we are doing it the Irish way like the motorways where the cost is out of proportion. Change should have been gradual over the years and factored in for the life of the line. In the same way as electricity infrastructure is costed it’s about the cost over the lifetime of the asset rather than the current cost.
Goods is offline   Reply With Quote
Unread 09-01-2018, 20:04   #13
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

The main purpose of Waterford-Mallow since about 1906 was Rosslare Boat traffic, especially the Rosslare Express. This is from another era, and there is not much point in wasting energy on nostalgia for a beautiful line.

Maybe Goods has a point about the cost of automated crossings. It appears that CCTV monitored and fully signalled 4-barrier crossings are the standard. There are very widely used automatic half-barrier crossings which should be perfectly OK for a fraction of the cost (unless of course you cant trust Irish drivers going round them in pursuit of a Darwin award)
ACustomer is offline   Reply With Quote
Unread 10-01-2018, 13:12   #14
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Originally Posted by ACustomer View Post
The main purpose of Waterford-Mallow since about 1906 was Rosslare Boat traffic, especially the Rosslare Express. This is from another era, and there is not much point in wasting energy on nostalgia for a beautiful line.

Maybe Goods has a point about the cost of automated crossings. It appears that CCTV monitored and fully signalled 4-barrier crossings are the standard. There are very widely used automatic half-barrier crossings which should be perfectly OK for a fraction of the cost (unless of course you cant trust Irish drivers going round them in pursuit of a Darwin award)
We had half barriers here for a while. Full barriers save a lot of potential problems and are the way to go. There are a lot of LC incidents in the UK annually, something which isn't the case here.
Jamie2k9 is offline   Reply With Quote
Unread 10-01-2018, 15:26   #15
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

Half barriers (operating automatically on the approach of a train) are used all over Europe and North America, especially on low-traffic and medium-to-low speed routes. Why is Ireland so special? Dopey drivers or hyper-litigious culture or civil servants with no regard for economic solutions?

They even have them in Northern Ireland!
ACustomer is offline   Reply With Quote
Unread 10-01-2018, 16:36   #16
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Originally Posted by ACustomer View Post
Half barriers (operating automatically on the approach of a train) are used all over Europe and North America, especially on low-traffic and medium-to-low speed routes. Why is Ireland so special? Dopey drivers or hyper-litigious culture or civil servants with no regard for economic solutions?

They even have them in Northern Ireland!
I'm not arguing with the effectiveness but full are safer.

Network Rail admit they are the most dangerous type of level crossing and there would be strict conditions where such barriers could operate. You are not going to save massive amounts of money just increase the number of near misses.
Jamie2k9 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 08:38.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.