08-08-2011, 12:37 | #1 | |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
[Article] Maynooth line station upgrades coming
Irish Times
http://www.irishtimes.com/newspaper/...301949270.html Quote:
Last edited by ThomasJ : 08-08-2011 at 12:50. |
|
08-08-2011, 12:48 | #2 | |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
Further details here - Seems most stations are getting the upgrade.
http://www.maynooth.org/?p=15340 Quote:
|
|
10-08-2011, 11:52 | #3 | |
Member
Join Date: Nov 2008
Location: Drumcondra, Dublin 9
Posts: 121
|
Quote:
|
|
10-08-2011, 14:20 | #4 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
The displays are dependant on the signalling upgrade. The current system only know that the train is between two signals, it doesn't know where between the two signals and therefore can't estimate arrival time.
__________________
|
10-08-2011, 15:04 | #5 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
Its worse than that the current system has no idea where any train west of Broombridge is
Control is currently from Maynooth which will transfer to Dublin once the city centre signaling upgrade is completed
__________________
Unhappy with new timetable - let us know |
10-08-2011, 16:59 | #6 |
Member
Join Date: Dec 2005
Posts: 132
|
When will they get the important things right?
On a slightly separate point, any progression on the Pelletsown/Royal Canal Park station? |
10-08-2011, 18:01 | #7 |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
|
10-08-2011, 19:10 | #8 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
|
10-08-2011, 19:11 | #9 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
Kilcock to Broombridge and the M3 spur is controlled from the Maynooth line SSI panel which is buried somewhere, the panel could be Cork for all the difference it makes...
__________________
Unhappy with new timetable - let us know |
10-08-2011, 19:46 | #10 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
Quote:
It is possible it may be done as part of the Maynooth Line Electrification, but at the moment, the scope for that is electrification and level crossing removal only.
__________________
|
|
11-08-2011, 06:52 | #11 | |
Really Regular Poster
Join Date: Oct 2010
Posts: 951
|
Quote:
Not sure that the city centre resignalling will resolve the issue either as the Maynooth line SSIs are non-standard and do not integrate easily with the CIS. I think you may have to await the resignalling of the Maynooth line itself - hardly the top priority in current circumstances. |
|
14-08-2011, 18:40 | #12 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
Well if that's the case they should look at equipping with a GPS system that can be linked to the train info system. Saying "we'll have to wait for Maynooth resignal" (something probably deferred until electrification can be afforded) when competing modes are rolling out real time is like the wifi thing all over again - IE dragged kicking and screaming into something that customers could really use.
|
15-08-2011, 16:28 | #13 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
Quote:
__________________
|
|
31-08-2011, 10:17 | #14 | |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
More details on this from Northside People
Quote:
Last edited by ThomasJ : 31-08-2011 at 10:41. |
|
31-08-2011, 11:31 | #15 |
Member
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
|
Oh, that's cool, I guess they're putting another entrance at the west end of the Clonsilla Road, opposite where the new bay platform will be(near the bottle bank, I guess). That's very handy, at the moment I and many others coming from the Joseph's hospital direction cut through some woods, across a green and though Portersgate to get to the current entrance faster.
Though having looked down there from the current platform, it looks really tight to squeeze in a track and platform next to the canal bank. There's also some nice mature trees on the southern side of the station right where the elevator shaft should go. Let's also hope that the lifts and overbridge don't impinge too much on the view westwards. |
31-08-2011, 11:35 | #16 |
Member
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
|
Also, here are the plans for the station works: http://planning.fingalcoco.ie/swiftl...=9&#tabdetails
The site layout plan is here: http://documents.fingalcoco.ie/Anite...s/00402761.pdf and the specs on the bridge and lifts here: http://documents.fingalcoco.ie/Anite...s/00402753.pdf Last edited by karlr42 : 31-08-2011 at 11:44. |
Thread Tools | Search this Thread |
Display Modes | |
|
|