02-04-2017, 21:50 | #1 | ||
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
Athenry P&R (proposal)
Quote:
Quote:
I'm sure short term they could address the exceptionally bad speeds, train rarely hits above 70 on the section with a lot of 50 and the 25 crawl into Galway. It should be a constant 80-90 with a second platform (suitable for long train) in Galway instead of a station loop outside it which just slows everything down. Last edited by Jamie2k9 : 02-04-2017 at 21:53. |
||
Thread Tools | Search this Thread |
Display Modes | |
|
|