Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Intercity and Regional > Galway - Limerick - Waterford - Rosslare
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Unread 20-08-2009, 13:23   #1
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default [Article] Blog post from local councillor Joe Ryan on the lack of services on line

Those of you in wexford-waterford might be interested in this,a piece from labour councillor Joe Ryans blog, Ryan represents wexford

http://cllrjoeryan.blogspot.com/

Quote:


When I started this blog last year the first issue I raised was the lack of public transport in Wexford. I focused on rail because the county still retains a lot of its rail infrastructure unlike many other counties and its something I want to see developed in terms of passenger and freight.
So the forthcoming rail timetable is a document I pour over as closely as a programme for government. I want to see how my town is affected for good or for bad. A timetable reveals what management believe is important. Publishing a timetable outs the management to the travelling public. The forthcoming timetable sees increased trains to Wexford from Dublin. I welcome that and it’s good to see that. Wexford is becoming a destination which allows a speedy turn around and return. Trains only take in revenue when they run, so keep the train moving is my motto. Which is why I’ve always pressurised management to run trains to Waterford. When I came to Wexford in the mid 90’s there were 3 return trains between Rosslare and Waterford, now we’re done to one train. The south Wexford line was particularly busy with sugar beet, now it’s a quiet back water since the demise of that industry.
The absence of freight presents huge opportunities to Irish Rail. To be fair to them they introduced a connection between the town and Waterford in response to my lobbying. I've travelled on the train myself one morning last year. Imagine my surprise when the train stopped in the middle of nowhere, the driver got out, crossed the road, opened the gates, drove the train across the road and the dismounted oncemore to shut the gate before resuming the journey to Waterford. But next month will see the retreat from Wexford as the service is scalled back.

The new timetables for implementation in September shows that while Irish Rail will provide a commuter service to Wexford to Waterford there will be no return service in the evening. While trains will leave Rosslare Europort as the connecting ferry service is docking at the pier making it impossible for passenger to connect as the rail company re-located the rail station about 600 M from the ferry terminal. The new timetable as a total mess.
The new timetable fails not just to integrate trains with ferries but even trains with trains. It’s incredible, a child could do better. Irish Rail has failed to promote in the local media the Wexford Waterford commuter link even though the return fare is cheaper than Bus Eireann. Next year rail services to the west will be extended but the chance to integrate to Wexford has been lost. Students who wish to commute to Waterford IT will find themselves marooned at Rosslare Strand on the return journey having missed the last connection to Wexford by 20 minutes. As a timetable it’s unworkable and will result in fewer passengers taking the train. When I heard about the potential cutbacks to train service I wrote to the 2 Green Ministers and the Transport Minister Noel Dempsey. The best response I got was that it had been referred the matter to Irish Rail who replied from Hueston Station to advise that the CEO was on holidays!

I’m also astounded that Irish Rail spent over €30K in 2008 taxiing train crews from Rosslare Europort to Waterford rather than running an evening service back to the city from Rosslare Europort. Given the low customer base in South Wexford, incurring such a high overhead on staff transport insured from the outset that the Rosslare Waterford rail service could never be viable, cutting the service in half insults the travelling public. This is a service that was set up to fail. Coupled with the severing of the New Ross line from the network, I wonder what is the commitment to the future of rail services out of Waterford? When will Irish Rail learn that we all don’t want to go to Dublin?
ThomasJ is offline   Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 22:27.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.