![]() |
![]() |
#1 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() When a report has succeeded it is placed on line, Platform 11 members continue to have access as soon as the reports are complete. In the case of public inquiries reports are made available after the inquiry has concluded public sittings
The full text of all submissions are available in the inspectors report when published. Today we released the Kildare Route Project submission Our focus is on the provision of a railway to meet the needs of the passenger and also to minimise disruption when things go wrong and during engineering works in the future e.g. interconnector tunnel. While quite supportive of some elements we are quite critical of some engineering choices made by Irish Rail and in particular those left out by the descoping which means Sallins, Newbridge and Kildare are left with no station upgrades. http://www.platform11.org/reports/#krp |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|