Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > General Information & Discussion > Events, Happenings and Media
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Unread 24-11-2006, 08:33   #1
Colm Donoghue
Really Regular Poster
 
Colm Donoghue's Avatar
 
Join Date: Dec 2005
Posts: 873
Default Melbourne's computerised train brakes fail < From Risks list>

from Risks digest, vol24 issue47
<Boyd Adamson <boyd-adamson@usa.net>>
Thu, 16 Nov 2006 09:13:50 +1100

Some of Melbourne's newest passenger trains have had to be withdrawn from
service after a spate of braking failures. Connex, the operator of the
suburban rail network, has reported 15 incidents involving trains
overshooting platforms since 13 Nov 2006 and is at a loss to explain the
problem. The most serious incident occurred on Tuesday night when a train
failed to stop at Brighton Beach station and traveled into the level
crossing at South Road. The boom gates still had not been lowered as the
train came to rest in the middle of the intersection. A rail system source
said cars were forced to break to avoid colliding with the train.

The problems involve a fleet of 72 German-built trains that were introduced
to the suburban network in 2003. Fourteen three-carriage trains have been
removed from service following emergency talks between Connex and the trains
manufacturer, Siemens. The withdrawal of the trains is expected to cause
some disruption to services, particularly on the Pakenham and Cranbourne
lines, until the problems can be fixed.

The source said the problems were connected to the trains' computerised
braking system. In several incidents, drivers were forced to apply emergency
brakes, push emergency stop buttons and activate handbrakes to bring the
trains to a halt. But even after activation of all manual braking systems,
some trains continued moving. One incident occurred while a driver was
undergoing assessment by a transport official. [...]

Since its introduction in April 2003, the Siemens fleet has been plagued
with controversy. The trains were initially too wide for suburban tracks and
have recently been repaired to fix faulty wiring. They have also been
criticised for having only two sets of doors on each side of each carriage,
causing bottlenecks for passengers.

http://www.theage.com.au/news/nation...266640138.html
Colm Donoghue is offline  
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 14:53.


Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.