Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.luas.ie/citywest-installa...l-systems.html
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#2 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.rpa.ie/en/news/Pages/Luas...UpdateNo7.aspx
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#3 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() Rumour on boards.ie has it that copper thieves have been about on the extension.
|
![]() |
![]() |
![]() |
#4 |
Regular Poster
Join Date: Dec 2007
Location: Cambridge
Posts: 131
|
![]() Good thing they've turned the power on then
![]() |
![]() |
![]() |
![]() |
#5 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() Progress as of 1 March 2011. All photos have captions.
__________________
Last edited by Colm Moore : 12-03-2011 at 16:51. |
![]() |
![]() |
![]() |
#6 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() More
__________________
Last edited by Colm Moore : 12-03-2011 at 16:48. |
![]() |
![]() |
![]() |
#7 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]()
__________________
|
![]() |
![]() |
![]() |
#8 |
Member
Join Date: Dec 2005
Posts: 541
|
![]() Can anyone familiar with the area tell me how well developed it is? Is it likely to suffer the same fate as the south end of the Brides Glen extension? I know the hotel and conference center were seen as trip generators but I'd imagine both of those are at risk in the short term.
|
![]() |
![]() |
![]() |
#9 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() Is there any ballasted track on the LUAS network? Seems to be a lot of slab in those pictures and some I've seen of Green Line.
|
![]() |
![]() |
![]() |
#10 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() Quote:
Cherrywood: http://www.bing.com/maps/?v=2&cp=sw7...&FORM=LMLTC C The NTA's 2030 vision suggests extending it to Greenogue http://www.bing.com/maps/?v=2&cp=swg...&FORM=LMLTC C The real problem is getting from the housing estates to the stops - in some cases there are huge detours. I have complained about access and I'm not sure what has been done, if anything. http://maps.google.ie/maps?f=d&sourc...08991&t=h&z=16 There is a mix of slab, ballasted and there is another type (where the track is flush with the surface and used at stops and roads), but the name escapes me.
__________________
Last edited by Colm Moore : 13-03-2011 at 07:11. |
|
![]() |
![]() |
![]() |
#11 | |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Quote:
Ballasted track is cheaper to install but more expensive to maintain but offers more flexibility
__________________
Unhappy with new timetable - let us know |
|
![]() |
![]() |
![]() |
#12 |
Member
Join Date: Dec 2005
Posts: 541
|
![]() Thanks Colm, that's good to hear. I'd still prefer to see these lines constructed closer to the city centre instead of in the outer suburbs but I hope it does well when it opens.
|
![]() |
![]() |
![]() |
#13 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() How would they run such an extension? I was puzzling over this yesterday and as far as I can tell from the RPA map the point at where the current extension ends it seems to be hemmed in by the Hibernian and Citywest Golf courses. Now I don't have a philosophical objection to ramming a light rail line through a golf course but I imagine the members and their barrister friends would.
|
![]() |
![]() |
![]() |
#14 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() I'm not sure of the exact details, but several of the Mansfield group companies have or have had difficulties and they might be perfectly happy to dispose of land.
http://www.irishtimes.com/newspaper/...274418707.html http://www.insolvencyjournal.ie/more...ger_H_S_S.aspx http://www.irishtimes.com/newspaper/...274266625.html
__________________
|
![]() |
![]() |
![]() |
#15 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.luas.ie/luas-citywest-tes...issioning.html
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#16 |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() The new map. First seen in Irish Rail's onboard magazine.
__________________
|
![]() |
![]() |
![]() |
#17 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.luas.ie/luas-citywest-fast-approaching.html
Quote:
__________________
|
|
![]() |
![]() |
![]() |