![]() Quote:
A real change or predictable pre-election spin for the masses? |
|
![]() |
![]() |
#2 |
Regular Poster
Join Date: Apr 2006
Posts: 69
|
![]() a bit of both ? One thought comes to mind. It is enevitable that transport spendings moves from roads to public transport as the motorway network is more than half done. Indeed it would appear that the rest could be done in the next three years.
The devil is in the detail , as always! |
![]() |
![]() |
#3 |
Chairman/Publicity
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
|
![]() Sure by 2050 most of Ireland will be in the GDA and we'll have DART to Thurles.
|
![]() |
![]() |
#4 |
Really Regular Poster
Join Date: Dec 2005
Posts: 873
|
![]() hey don't knock it, Thurles heuston is possible faster than the length of the dart line.....
|
![]() |
![]() |
#5 | |
Member
Join Date: Dec 2005
Posts: 632
|
![]() Quote:
I like Cowen. I don't like him enough to outweigh how much I hate the rest of FF however. |
|
![]() |
![]() |
#6 |
Member
Join Date: Dec 2005
Location: Northern line
Posts: 1,311
|
![]() "In particular unnecessary and wasteful duplication of infrastructure provision should be avoided."
WRC v Atlantic Corridor, Luas link up v Metro? Or am I not reading into that properly.. |
![]() |
![]() |
#7 |
Member
Join Date: Dec 2005
Location: West Tower
Posts: 355
|
![]() A list of duplicate projects should be assembled starting with the two you mentioned with the possible addition of
|
![]() |
![]() |
#8 |
Member
Join Date: Dec 2005
Location: Northern line
Posts: 1,311
|
![]() Interestingly enough, the Luas link up, due for completion in 2008, has gone quiet, very quiet indeed since the route options came out November 2005. Considering metro north route options have come, Cherrywood has gone through PI, Point depot line is at PI and Citywest has gone in for RWO it looks like the luas link up might be under scrutiny at a higher level. Maybe that or maybe not. It was always seen as Cullen's pet project. Personally, if it doesn't get build by 2008 I wouldn't be too bothered as long as the metro comes in on time but I suspect construction synchronising would be needed. Would be the most obvious example of duplication.
Another one would be rail commuter services to Tuam from Galway and the Galway - Tuam dual carriageway which I would presume will have more attractive journey times by bus. Last edited by Mark : 15-06-2006 at 10:07. |
![]() |
![]() |
#9 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
![]() How far would the 80m esimated cost of the Luas link-up go towards the Stephen's Green-Charlemont Metro surfacing at Iveagh Gardens? I could live without the linkup if it meant we'd get a joined-up Metro from Swords to Cherrywood in 2012.
|
![]() |
![]() |