![]() |
|
![]() |
#1 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Looks like another PR gig tomorrow in Dublin
Despite having a route, planning permission, we are going to drop all that and start again. Usual talk of 60m platforms, as always living in the current and not the future
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#2 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
![]() It's all about appearing to do something without ever doing anything, isn't it? I don't believe the current government has any intention of ever building Metro.
I hope one day we'll have a government that see mass transit as essential to the future of the city. |
![]() |
![]() |
![]() |
#3 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() What we know of the Metrolink www.metrolink.ie (yes the website is legit and owned by the NTA) engineering wise won't work...
Its basically the original Metro plan which as we all know had to be radically redone to actually work so we basically shredded everything and are starting fresh again.
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#4 |
Regular Poster
Join Date: Dec 2005
Location: Co. Wicklow
Posts: 124
|
![]() Massive interchange at Glasnevin between MetroLink and the two IR lines seems like a good idea.
Is ridiculous that it was totally redesigned. Here's to three years in the planning black hole. |
![]() |
![]() |
![]() |
#5 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() Great idea, but it was ruled out last time around.
The drawings do not show an Irish Rail station
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#6 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
![]() I think the idea of an interchange station at Whitworth (presumably they can't call it Phibsborough because the name is already taken by the Green Line) is the one good part of this plan.
Any idea why it was ruled out the last time? |
![]() |
![]() |
![]() |
Thread Tools | Search this Thread |
Display Modes | |
|
|