Minister for Transport Martin Cullen will today announce plans for a new Dublin transport authority designed to reform the capital's traffic management systems. He will today publish a report that will set out how the new Dublin Transportation Authority will work. It will propose that the new authority assumes responsibility for overseeing all major public transport projects, including Metro, a new rail tunnel through the city centre and the extension of the Luas network. The authority will also be responsible for regulating public transport in the city and will ultimately have responsibility for bus routes. The Railway Procurement Agency is to be subsumed into the new authority, which will also take over some of the functions of Dublin Bus and Iarnród Éireann. The report also proposes that the new body will have the power to set fares, complete the integrated ticketing project and regulate the entire market. © The Irish Times/ireland.com http://www.ireland.com/newspaper/bre...breaking13.htm |
![]() |
![]() |
#2 | |
Really Regular Poster
Join Date: Dec 2005
Posts: 826
|
![]() Quote:
|
|
![]() |
![]() |
#3 |
Member
Join Date: Dec 2005
Posts: 541
|
![]() Isn't there an expert group report on it due out today?
He'll announce that it's on his desk and he's giving it careful consideration. And then (several months later) get a consultant to report on the expert group report which will take another few months. That report will sit on his desk for another few months while he does precisely nothing except release press reports. |
![]() |
![]() |
#4 | |
Member
Join Date: Dec 2005
Location: Northern line
Posts: 1,311
|
![]() Quote:
www.transport21.ie |
|
![]() |
![]() |
#5 |
Member
Join Date: Dec 2005
Posts: 267
|
![]() report looks good
P17 "Critical to the successful delivery of an integrated public transport infrastructure in the GDA within Transport 21 will be the effective completion of three landmark rail projects, namely the Metro North rail line with a north-south alignment across the city-centre, the Interconnector rail line with an east-west alignment across the same area and the construction of a genuinely integrated facility at St. Stephen’s Green allowing seamless transfer for passengers between Luas, Metro and suburban rail. Tunnelling adds significant complexity and risk in the context of these projects. Ensuring that a coherent and integrated approach is applied from the commencement of planning, through detailed design and specification and to final completion of construction of these projects is a hugely important critical success factor in the context of overall delivery of Transport 21. Therefore the Team recommends that these three landmark projects should be the direct responsibility of the Dublin Transport Authority itself. P19 Iarnrod Éireann is currently responsible for the Interconnector. Initial planning for the Interconnector is expected to commence in 2006, gaining momentum over subsequent years with the objective of commencing construction in 2010. hmmm P29 To afford the Authority additional flexibility, the Team recommends that it be given a substantial short-term borrowing authority, perhaps of the order of €1 billion. This would allow it to manage the unevenness of its investment programme while being required to stay within its aggregate capital envelope under Transport 21. p35 The Authority should be responsible for delivery of an integrated public transport system for the GDA. It should develop and promote a single brand for all public transport services; it should procure and operate integrated ticketing and integrated information systems for public transport and should have powers to require participation by providers of public transport in both these systems. It should also ensure good physical interchange facilities are provided for public transport passengers, including park-and-ride. cool p37 Critical to the successful delivery of an integrated public transport infrastructure in the GDA will be the effective completion of three landmark projects - the Metro North, the Interconnector and the St. Stephen’s Green Interchange. THe DTA will even have a dedicated "integration director" to make one brand and ticket and all that if this goes ahead as the report suggests i'm voting FF at next election |
![]() |
![]() |
#6 |
Member
Join Date: Dec 2005
Location: Northern line
Posts: 1,311
|
![]() interesting stuff alright
|
![]() |
![]() |
#7 |
Really Regular Poster
Join Date: Feb 2006
Location: Navan
Posts: 305
|
![]() |
![]() |
![]() |