![]() The latest investment by the Exchequer in the important sector of "rail consultants" can be found here:
http://www.irishrail.ie/cat_news.jsp?i=4482&p=116&n=237 That West on Track were found in the "who we talked to" section and the number of times the "National Spatial Strategy" is namechecked are only two of the depressing features of these documents. |
![]() |
![]() |
![]() |
#2 |
Really Really Regluar Poster
Join Date: Jun 2010
Posts: 2,146
|
![]() Just in relation to the Junction at Kilkenny. Run the current tracks from Dublin and Waterford into Kilkenny. There is room to do it as it was double tracked before. Services could cross there with little delay than there currently is as the train must be at the platform before the other service can use the junction. Train speed would not need to be reduced so early and it could say up to 10 mins. It would only require a few km of new tracks to meed the end of the current one at Plat 2 in Kilkenny which goes out quiet a but before it ends. The points to connect both platforms are there and it would only require one new signal to be installed.
Can't see it costing a huge amount and IE would not publish this on there blog. The restrictions were not there when the Mark3 were operationg, what makes the ICR so different? Last edited by Jamie2k9 : 22-02-2012 at 19:25. |
![]() |
![]() |
![]() |
#3 | |
Really Regular Poster
Join Date: Aug 2011
Location: North Tipperary
Posts: 258
|
![]() Quote:
No expert on electric rail but Dart at the moment would use 1.5kv and the underground would be less than 10kv. Wouldn't an intercity electric be over 15kv? |
|
![]() |
![]() |
![]() |
#4 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() Destructix - IE have a bit more scope to decide what voltage they want. Over here where commuter lines run on freight owned lines partially or completely, the word appears to be that the freight companies said "25kV AC catenary or not at all" - the problem being that the higher you push the voltage the lower the power draw which helps with substation spacing but it has the downside of needing heavier on-train transformers and also needs larger clearances from neighbouring structures.
In theory I suppose you could run intercity on 1.5kV DC but I'd say it's more likely that the train would be dual voltage with the ability to switch to 3kV DC or even 25kV AC outside the areas currently or likely to be served by DART. Of course, the ideal would have been if IE had bought a bunch of SNCF B81500 or 82500s for outer suburban work rather than doubling down on the 22000s and trusting Rotem to keep making them the same way - then you could have had a Rosslare service coming into Greystones and raising its pantograph for an electric mode ride through to Malahide and back to diesel mode for a run out to Dundalk, with the same train kept on route even if the electric network expanded or contracted (for example a gradual electrification towards Maynooth). But what can one expect when the clowns can't even factory fit selective door opening and thus forced to keep six car 22K trains off the Wicklow line? |
![]() |
![]() |
![]() |
#5 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
![]() IE plan to use 25kV AC
Its 15 years ahead before a decision will need to be made on this phase
__________________
Unhappy with new timetable - let us know |
![]() |
![]() |
![]() |
#6 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() |
![]() |
![]() |
![]() |
#7 | |
Local Liaison Officer
Join Date: Dec 2006
Posts: 5,442
|
![]() http://www.irishtimes.com/newspaper/...312243834.html
Quote:
__________________
|
|
![]() |
![]() |
![]() |
#8 |
Really Really Regluar Poster
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
|
![]() The most novel idea in the whole thing was a flippin' bus link to the airport - and that would have involved stopping 100mph services in the middle of the KRP.
You bring in consultants for two reasons - confirm existing assumptions or win an internal conflict. I'm betting on the first. |
![]() |
![]() |
![]() |
#9 |
Really Regular Poster
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
|
![]() A few remarks
|
![]() |
![]() |
![]() |
#10 | |
Member
Join Date: Sep 2008
Location: Cork City/Midleton/Mallow
Posts: 211
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#11 |
Really Really Regluar Poster
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
|
![]() While they are talking about quick wins, one thing I have often thought would make a lot of sense on the Sligo line as a quick win would be to run 2x3 22K sets as far as Longford or Mullingar and have half of it turn back to Dublin allowing you double the frequency and capacity to Longford although this would be a push on a single line.
The report notes that the loadings on the Sligo line past Longford are extremely low. I would say very few trains run more than 50% full past Mullingar. Another major omission to me is that there is very little attention paid to the possibility of massive increase in oil prices. Car-based commuting from Mullingar or further has become decreasingly viable over the last five years due to the increase in fuel prices. It is only a matter of time before 2 euro per litre diesel happens and at that point, a car trip from Sligo starts to get less viable than the train. What happens if there is 3 euro diesel? At that point, a billion euro motorway is a white elephant while a similar sum invested in a dual track electrified rail system become a sensible investment. It is more than 50% likely that diesel will cost greater than 3 euro per litre inflation-adjusted by 2030. |
![]() |
![]() |
![]() |