05-03-2007, 23:20 | #1 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
Connecting trains
Hi guys. I was just wondering about connecting trains and if they still exist. The reason being is because i was at pearse awaiting the last train to maynooth. There is normally a train to malahide ten minutes before. There was a note of an earlier train failure and delays as a result. There was a delay to the malahide train of 19 minutes but maynooth ran on time. Do connections still run?
|
Thread Tools | Search this Thread |
Display Modes | |
|
|