Unread 23-05-2012, 09:35   #1
JohnDough
New to the board
 
Join Date: May 2012
Posts: 13
Default Evening peak trains

These services are now always packed when arriving at Pearse so why can't we have a empty train starting at Pearse rather than the Bray service packed to the rafters as this seems to be the logical solution.
JohnDough is offline   Reply With Quote
Unread 23-05-2012, 11:54   #2
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

To date, there hasn't been the capacity through Connolly. Hopefully that will improve over the next 6-12 months with the resignalling.

Of course there are people working in DĂșn Laoghaire, Blackrock and Ballsbridge heading for Maynooth/Longford.
__________________
Colm Moore is offline   Reply With Quote
Unread 23-05-2012, 23:12   #3
JohnDough
New to the board
 
Join Date: May 2012
Posts: 13
Default

Cannot see how at least 1 train at these times can be started empty so no need for extra capacity just common sense.
JohnDough is offline   Reply With Quote
Unread 24-05-2012, 06:49   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The siding in Pearse station can only hold a very small number of trains and getting a train in and out of the sidings holds trains up going in all directions.

So the solution at peak hour is to run some trains to/from Bray which provides a through service and avoids the congestion at Pearse.

There is considerable demand on the south side particularly at Blackrock, Lansdowne Rd and Grand Canal Dock

The signaling upgrade will result in the third platform at Grand Canal Dock being brought into use and Grand Canal Dock is likely to become the terminus for all Maynooth line services. As the very long term plan is to operate Bray-Maynooth as a DART service the current pattern is here to stay
Mark Gleeson is offline   Reply With Quote
Unread 24-05-2012, 10:24   #5
Thomas Ralph
IT Officer
 
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
Default

Is the plan for platform 1 at Grand Canal Dock to become the main platform for up DART and commuter services, then use platform 2 mainly for trains terminating there?
Thomas Ralph is offline   Reply With Quote
Unread 24-05-2012, 11:05   #6
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Thats the plan
Mark Gleeson is offline   Reply With Quote
Unread 25-05-2012, 08:45   #7
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

In addition to the commissioning of the unused third platform at Grand Canal Dock the city centre re-signalling scheme will increase the nominal capacity of the line between Pearse and Connolly from about 12 trains per hour per direction to about 20 trains per hour per direction.

Under the revised signalling it will be possible for a northbound train to leave Pearse while the plafform at Tara Street is occupied. Similarly it will be possible to leave Tara Street with a train stationary outside Connolly

Whether the new arrangements actually delivers increased capacity will critically depend on the management of platform occupancy at Pearse, Tara Street and Connolly. The present pattern of operation whereby northern and western diesel operated suburban services idle at Connolly and Tara Street "waiting for time" will clearly have to cease

Currently diesels are scheduled to take 7-8 minutes from departing Pearse to departing Connolly while DARTs are typically scheduled to take 5 minutes. In reality the performance differential trains through this section is less than 30 seconds and scheduling services to take more than five minutes merely generates unnecessary congestion and limits potential throughput.
Inniskeen is offline   Reply With Quote
Unread 31-05-2012, 23:24   #8
JohnDough
New to the board
 
Join Date: May 2012
Posts: 13
Smile

The only answer is to bite the bullet and add two more lines from Connolly to Pearse as the existing line was only built to cater for one train every thirty minutes to a hour back in the fiftys!!
JohnDough is offline   Reply With Quote
Unread 01-06-2012, 09:07   #9
Thomas J Stamp
Chairman/Publicity
 
Thomas J Stamp's Avatar
 
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
Default

well, that isnt ever going to happen.
__________________
We are the passengers
Thomas J Stamp is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 21:00.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.