Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Commuter Services > DART
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
Thread Tools Search this Thread Display Modes
Unread 18-05-2010, 14:53   #1
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default Lets all go to platform 3

Its starting to become a joke in Dun Laoghaire

So after finally getting Irish Rail to admit the timetable was impossible they now get the 7:37 from Malahide to Dun Laoghaire to leave at 7:40. It of course arrives Dun Laoghaire at the same time as before, just of course under the 5 minute delay window

Staff in Dun Laoghaire of course frequently fail to notice that the 8:37 starting from platform 3 will be held to let the 8:44 train on platform 1 through first. By the time you notice the signal going green its too late to swap platforms

So this morning, it looked like the 8:44 would get out first, but everyone is directed to platform 3, sure enough 8:44 rolls in and out on platform 1, normally thats ok since the 8:37 will follow on the heels of the 8:44. But then we are told the train we are on is stuck due a points failure so we have to change for the 8:59.

Not the first time, bad coordination and communication.
Mark Gleeson is offline   Reply With Quote
Unread 07-06-2010, 21:13   #2
shweeney
Regular Poster
 
Join Date: Mar 2006
Posts: 180
Default

on a similar topic - why is so difficult to get from P3 to P1 - they're effectively the same platform but it's pointlessly fenced off between them, and where there is a gate in the middle, its always locked. Why Irish Rail, why!?
shweeney is offline   Reply With Quote
Unread 07-06-2010, 23:02   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

P3 to P1 require a hike via the booking office and two flights of stairs
Mark Gleeson is offline   Reply With Quote
Unread 11-06-2010, 14:09   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Repeat experience this morning, lots of folks standing on platform 3, no announcement that the next train will be off platform 1
Mark Gleeson is offline   Reply With Quote
Unread 11-06-2010, 19:48   #5
Alan French
Member
 
Join Date: Dec 2008
Posts: 89
Default

That's right - there was no public announcement. I managed to catch the 08.44 from platform 1 because I was watching the signals from the bridge. I overhead a staff member directing another passenger, but there was no announcement.
Alan French is offline   Reply With Quote
Unread 25-06-2010, 08:58   #6
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

This week has been fun

Mon/Tues was fine as normal platform 3

Wednesday everyone is told to go to platform 1, sure enough the train rolls into platform 3, but its so late that it doesn't matter and the 8:44 arrives on platform 1 at the same time

Thursday everyone is told to go to platform 1, finally it works and a train does leave for Connolly

Friday everyone is heading to platform 3, I make inquiries given the delays after the breakdown at Tara Street at 8pm and all of sudden its off to platform 1 again.
Mark Gleeson is offline   Reply With Quote
Unread 24-09-2010, 09:33   #7
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

After a reasonable run they made a balls of it again in Dun Laoghaire

As usual the 8:37 train is sitting ready waiting in platform 3 for the 7:45 from Howth to Bray to arrive so it can leave. 8:38 it arrives but the 8:37 doesn't move.

The usual next train platform 3 pa announcements is absent which usually indicates something is wrong

I see a yellow reflection in the window, the signal on platform 1 has cleared automatically to yellow at 8:41 as the 8:25 from Bray approaches, 8:37 train is being held for the 8:25 train to pass it out. Fairly common normally occurs when the points give trouble.

I swap to platform 1, signal goes green. Excellent right call 8:25 train will go first. Then the signal goes back to red, WTF

So at 8:44 we now have a DART in both platform 1 and 3 each at red signals. At 8:46 the 8:37 rolls out, 8:48:30 the 8:25 rolls out

A whole stack of bad management
  1. No pa announcements about the 8:37 as normal
  2. The signalman failed to let the 8:37 train out into its usual slot
  3. The signalman failed to disable auto routing at platform 1 which resulted in the 8:25 blocking the 8:37 in
  4. The signalman committed the ultimate no no of returning a signal to red in the face of a moving train
  5. Replacing a signal to red starts a timer to prevent another conflicting route being set, so the 8:37 was held for 90 seconds so reality is the 8:44 could have been allowed to run as normal without delay and the 8:37 follow 2 minutes behind, net delay 10 minutes total. Actual delay incurred 15 minutes and effected 3 times more people.

Last edited by Mark Gleeson : 24-09-2010 at 13:30.
Mark Gleeson is offline   Reply With Quote
Unread 13-11-2010, 19:32   #8
Alan French
Member
 
Join Date: Dec 2008
Posts: 89
Default

The same problem is occurring again. On Thursday 11th, the 08.37 left before the 08.44, both several minutes late, and the station staff had no idea which was to leave first.

I have never seen the "turn-round" happen so quickly! The terminating train arrived at platform 3, so I knew it would be a few minutes before it could leave. Then suddenly, the signal at platform 3 turned green. So I moved towards platform 3. I was still on the ramp, squeezing through the crowds who had just alighted, when the train departed. It couldn't have been more than 2 minutes after its arrival.
Alan French is offline   Reply With Quote
Unread 15-11-2010, 09:31   #9
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

This morning brought the situation to a new low

The PA is made for P3, we all dive down to the platform, after 5 minutes a pa is made from Connolly to go to platform 1 and that the train was going to be non stop Dun Laoghaire - Sydney Parade

Sure enough the train rolls into P1 and takes off only for the driver to slowly accelerate to 100kph and then brake heavily at Blackrock, the stop in Sydney Parade was noticeable longer than usual.

No PA to apologize and of course skipping several stations got the train into Connolly less than 5 minutes late

Last edited by Mark Gleeson : 15-11-2010 at 09:36.
Mark Gleeson is offline   Reply With Quote
Unread 15-11-2010, 11:26   #10
Thomas Ralph
IT Officer
 
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
Default

That just makes it a cancellation instead of a late.
Thomas Ralph is offline   Reply With Quote
Unread 15-11-2010, 11:36   #11
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

But in Irish Rail eyes that is not a cancellation, as the train ran as planned, of course the plan was only communicated minutes before the train left.

That said it was fun to cruise at 105kph for 2 km
Mark Gleeson is offline   Reply With Quote
Unread 15-11-2010, 12:30   #12
Thomas Ralph
IT Officer
 
Join Date: Sep 2007
Location: Greenwich, London
Posts: 1,860
Default

If the train skips stops then surely that means it didn't run "as planned"?
Thomas Ralph is offline   Reply With Quote
Unread 15-11-2010, 12:42   #13
Mickey H
Really Regular Poster
 
Mickey H's Avatar
 
Join Date: Oct 2007
Posts: 279
Default

Quote:
Originally Posted by Mark Gleeson View Post

That said it was fun to cruise at 105kph for 2 km
That is above permitted train and line speed, was the ATP not working?
__________________
26271 12-60
Mickey H is offline   Reply With Quote
Unread 15-11-2010, 14:08   #14
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

107kph is the trip point. ATP was fully functional and nailed us leaving DL. I've never been that fast on a DART as I was this morning, the train was under power the whole way, when we braked down to 50kph the difference was amazing

We definitely were above 100kph, I travel the line regularly on non stop trains. I've checked back and the speed between Salthill and Blackrock was an average of 98-105kph allowing for inaccuracies, bear in mind the train braked before Blackrock

That said it was within the limits and tolerances, train in question has a design speed of 110kph

Last edited by Mark Gleeson : 15-11-2010 at 14:34.
Mark Gleeson is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 08:35.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.