13-12-2021, 11:27 | #1 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
DART+ Order
First step of the fleet order today
Alstom to provide 19 half length, articulated sets, 13 of which are battery capable for Dublin - Drogheda and 6 for existing DART services.
__________________
Unhappy with new timetable - let us know |
13-12-2021, 22:48 | #2 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
They look good but I have a couple of questions...
The video shows 5 car sets. I thought 8 cars was the maximum for some of the stations on the commuter network. Am I wrong, or will some stations need platform extensions for them to run in pairs? Am I right in thinking no toilets? I know the current DART cars don't have them, but on longer commuter routes it could be an issue. Will the automatic wheelchair ramps work in stations with curved platforms, or will those continue to need a staff member with a ramp? The end coaches seem to only have one set of doors per side. Will that slow down loading/unloading? |
22-12-2021, 09:03 | #3 |
Really Regular Poster
Join Date: Jan 2006
Posts: 767
|
The 5-car sets are articulated, which lessens the space between individual carriages, also the carriages are a bit shorter as according to Alsthom the units are 82m long, so two units working in multiple should fit the existing platforms.
|
24-12-2021, 12:41 | #4 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
Thanks!
That makes a lot of sense. As far s I know a 29K set is also approx 80m in length. I'd quite like to see some full length walk-through sets (presumably 10 cars), which I think would be awesome at peak times. However, they would obviously limit flexibility. Hopefully there will be some longer sets in additional orders. |
29-12-2021, 12:31 | #5 |
Member
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
|
Has there been any decision on when the expansion of the electrified network will actually start?
The first new trains won't arrive until 2025. If we were to actually start electrification now, we could probably have a fair bit of the network electrified by the time they start arriving. If we were actually serious about electrification, battery trains seem unnecessary, as having at least one line electrified by 2025 should be quite feasible. For example, if Maynooth electrification started now, to be completed by 2025, the first batch of trains could be concentrated on that line, freeing up diesel railcars for other routes. Other lines could then be worked on for later batches. Battery trains seem a lot like an excuse to put upgrading the network on the long finger. |
30-12-2021, 09:13 | #6 |
Really Regular Poster
Join Date: Jan 2006
Posts: 767
|
James Shields: I agree with you 100%. Electrification of lines incurs substantial up-front costs, but there are big long-term savings. All-electric trains are simpler, more reliable, almost certainly cost less, probably last longer. Also electric trains do not have to lug tons of batteries around with them, and the laws of physics are pretty definite on the consequences of this for energy saving. Finally, batteries need frequent re-charging and the result in terms of turn-around times and therefore fleet utilisation should be obvious.
What's not to like about electrification? |
30-12-2021, 16:19 | #7 | |
Really Regular Poster
Join Date: Aug 2013
Posts: 602
|
Quote:
DART+ West will see the railway order application submitted in 2022. After that timings are subject to the planning process, potential judicial reviews, and then final government approval of the business case at that point (the new fiscal controls to avoid the spiralling of costs as per the hospital). Only at that point can construction commence. |
|
31-12-2021, 10:27 | #8 |
Really Regular Poster
Join Date: Jan 2006
Posts: 767
|
@berneyarms: Ah the good old dysfunctional planning system strikes again. The NTA (and whoever else) should have a portfolio of projects and draft business cases so that when the circumstances are right, the process can start quickly. Final Government approval should follow quickly if there has been proper planning done in advance.
You imply that the Govt business case approval must wait for the planning process and judicial review process to finish. This is surely the wrong sequence. As for the railway order and formal planning permission, we need a radical re-think: Do we need such a convoluted process when developments are largely within existing railway property? You don't need planning permission to erect new signal posts, but you do need it if you want to erect OHLE. Why? |
31-12-2021, 19:22 | #9 | |
Really Regular Poster
Join Date: Aug 2013
Posts: 602
|
Quote:
The government has to formally approve the business case before planning applications (this has happened for DART+ West) but also again once planning permission is granted in order to ensure that the costs as at that stage (which is when tenders would be agreed) aren’t getting out of control. |
|
01-01-2022, 21:24 | #10 | |
Really Regular Poster
Join Date: Jan 2006
Posts: 767
|
Quote:
Transport project are subjected to huge extra analysis and delay because the health sector has screwed up in its cost control (as they usually do). I am reminded of an earlier rail cost-overrun saga. The mini-CTC project ran into huge cost and technical problems, but was eventually rescued when Irish Rail brought it largely in-house. Also the National Roads Authority eventually brought projects to completion on time and within budget. All of this was because there were some good project managers in place. It seems to me that endless reviews by external bodies with not so much in the way of project management skills will solve nothing: imagine the delays when the NTA, DoT, Irish Rail and everyone lese have to sign off on everything and every change gets endless reviewed .... |
|