Limerick gets the same 100% all ran
All ran means all trains ran according to the service IE planned so it excludes engineering works also even if the train breaks down it still left the terminus
Its really hard not to get 100% Cork won't for Q4 2006 or Q1 2007
Take a look
http://www.railusers.ie/members/ie_mou, the long sought after agreement between IE and the DoT