Quote:
Originally Posted by James Howard
It would be a lot handier if the Luas wasn't shut down.
Only in Ireland would they shut down the primary transport link between the two halves of the capital city's rail network for 2 months with hardly a whimper from anyone. Instead everyone just throws up their hands and says, oh it's a hard job and that must be how long it takes if that's what they said they need.
Ashtown isn't such a great option on a Sunday from a frequency perspective.
|
Well perhaps you can tell us when IS a good time to do this work?
There is never a good time to carry out major engineering works that requires extended closures.
Someone will always be put out.
Incidentally several of Munich's tramlines are currently closed in the city centre for three months due to major engineering works.