View Single Post
Unread 19-09-2011, 08:48   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

I very much doubt its a passing loop, if it was it would be much longer 350-400m

The cheap solution to capacity is an intermediate block signal as per Galway Athenry and Bray Greystones which allows two trains in the same direction in a single track section

Its probably elimination of a crossing and related works
Mark Gleeson is offline   Reply With Quote