Thread: 2009 timetable
View Single Post
Unread 30-03-2009, 13:52   #27
roamling
Member
 
roamling's Avatar
 
Join Date: Feb 2009
Location: Lusk
Posts: 112
Default

Quote:
Originally Posted by PLUMB LOCO View Post
There would be no problem operating 6 or 8 carriage trains on the Rosslare line if CIE/IE wished to. They do exactly what suits them and throw up all sorts of Health & Safety concerns when it suits them.
I guess there would be health and safety concerns if a platform is to short (at the latest when a passenger uses the wrong exit and misses the platform ) But seriously, when I came to this country 5 years ago (before that I was complaining to Deutsche Bahn ) I could not believe that I had to go into the first two carriages to leave the train at Castlebar for example. I considered that a health and safety issue and actually people DID leave the train there off limits the platform because the doors weren't locked.

Last edited by roamling : 30-03-2009 at 14:23.
roamling is offline   Reply With Quote