View Single Post
Unread 31-10-2015, 17:51   #63
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
It was hard to see as all the passengers were corralled on the platform while the train sets were connected and the doors were tested. (I was at the very front to board the "A" carriage) I have to say I was both surprised and impressed as service resiliency has never been a feature of the Enterprise service. I was even more surprised that a full catering service was available (this crew are Dublin based). The 22000 set has worked well, operating three round trips a day with superior acceleration to the DD sets and while not as comfortable work well: if we ever achieved the nirvana of an hourly service a 22000 five carriage set in addition the the DD sets would be perfectly acceptable.
Crew probally got a hotel for the night, will be surprised if they were bused to Dublin.
Jamie2k9 is offline   Reply With Quote