View Single Post
Unread 25-04-2016, 19:43   #14
berneyarms
Really Regular Poster
 
Join Date: Aug 2013
Posts: 602
Default

Quote:
Originally Posted by Jamie2k9 View Post
The issue here is not really the DART schedule but more so the 10 April deadline which became obsolete as soon as IE announced the cancellation of the 10 minute service. There was no obligation to ram a half baked timetable through even if one side had agreed or not. Services could of remained as normal and no changes were required bar removal of the relief morning service and Newary-Bary now Connolly moving to ICR.

But no they went messing with the timetable, did NIR introduce a network wide schedule on 10 April if not the existing schedule could be operating perfectly normal.

Your are totally correct, things are not as clear cut however with IE they it up a level and we see it timetable after timetable.
NIR did issue revised timetables - that is my point.
berneyarms is offline   Reply With Quote