Quote:
Originally Posted by MrX
It's a pity it wasn't a MK3, with non-retention toilets i.e. flushing directly onto the line.
|
going OT but I notice that one of the evening Sligo services is now being run by a Mk 2 set with the consequence that the track at platform 4 in Connolly is (inevitably) covered in ****. Delightful.