Unfortunately Irish Rail missed the opportunity to create a really useful facility at Clongriffin which would have gone some considerable way towards allieviating the operational disaster that is Malahide.

It appears there are now plans to rip out some of the connections immediately north of Howth Junction and thus further reduce operational flexibilities. Admittedly had a proper layout been installed at Clongriffin in the first instance, the connections north of Howth Junction could have been removed without any loss of operational flexibility.
TBH if it continues then perhaps it's time for the NTA to look at the problem and force adequate operational flexibility on major sections of track into PSO contracts or have a fine for every period services are suspended for train/signal issues.

Are with in a situation the sections been removed are life expired and IE are not spending the money renewing them or is it just operating a simply system where when things go right it's fine but when they don't everything stops.