Quote:
Originally Posted by Mark Gleeson
Recon team reports that there was nothing wrong with coaches 7 and 8, a 4 coach 2600 set appeared mid morning in addition to the 6 coach set, so it was another train that had failed
|
The four car 2600 set ran the 21.00 pearse-maynooth and the (deferred) 23.10 pearse-maynooth. if it did do the full run that the 29000 set normally does it would have run the 17.08 connolly-balbriggan and 19.00 pearse-maynooth as well.