View Single Post
Unread 23-03-2013, 17:04   #2
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Is the problem that the crossing trains are 6-car, ruling out a Castlerea crossing?

Ideally an N60 bypass or even a relief road might allow closure of the level crossing and extension of the loop platform to 176m which would add some flex to the timetable but clearly that's not on the cards for a LONG time.
dowlingm is offline   Reply With Quote